Laserfiche WebLink
BOA 6/23/94 Minutes <br /> Page 8 <br /> Dreps/Rlopp to grant, with conditions, permit to fill and grade for <br /> drainage. Also grant variance of 45 feet from normal high water <br /> mark to permit residence additions as proposed. <br /> CONDITIONS: <br /> 1. That plans and specifications be prepared by a licensed <br /> engineer within the scope of the application, and filed with the <br /> Zoning Department before commencement of any work. <br /> 2 . That all work be performed in compliance with approved <br /> engineering standards and all applicable governmental rules and <br /> regulations particularly Sec. 11. 05 (4) of DCO. <br /> 3 . That there be filed with the Zoning Department a certificate of <br /> compliance by a licensed engineer at the completion of the project. <br /> 4. Inspection and approval by Zoning Department upon completion of <br /> project. <br /> 5. Completion and certification deadline is October 1, 1994. <br /> FINDING OF FACT: <br /> 1. Additions to residence are to be family room and garage <br /> expansion. <br /> 2 . Flood zone permit will be necessary to fill in those areas <br /> designated as such. <br /> 3 . Residence backfill will keep surface drainage away from <br /> residence. <br /> 4. Engineering data provided by L. Peter Wolf, P.E. <br /> CONCLUSION: <br /> 1. The project as planned with specified conditions will not <br /> result in substantial detriment to navigable waters by erosion, <br /> sedimentation, impairment of fish or aquatic life, or safe and <br /> healthful conditions. <br /> Motion carried 4-0. <br /> APPEALS FROM PREVIOUS HEARINGS <br /> 2501 - Alldridge - Pleasant Springs 4/28/94 P.H. <br /> (Decision made with #2526) <br /> 2510 - Brunetti - Pleasant Springs 5/26/94 P.H. <br /> IN FAVOR: V. Brunetti & N. George OPPOSED: --- COMMUNICATION -- <br /> (Applicant has withdrawn request for sideyard variance. <br /> Dreps/Gaskill to grant with conditions permit to fill, grade and <br /> retaining structure in conjunction with new boathouse construction. <br /> CONDITIONS: <br /> 1. That plans and specifications be prepared by a licensed <br /> engineer within the scope of the application, and filed with the <br /> Zoning Department before commencement of any work. <br /> 2 . That all work be performed in compliance with approved <br /> engineering standards and all applicable governmental rules and <br /> regulations particularly Sec. 11. 05 (4) of DCO. <br /> 3 . That there be filed with the Zoning Department a certificate of <br /> compliance by a licensed engineer at the completion of the project. <br /> fiew 4 . Inspection and approval by Zoning Department upon completion of <br /> project. <br /> 5. Completion and certification deadline is October 1, 1994 . <br />