Laserfiche WebLink
(110, BOA 6/23/94 Minutes <br /> Page 9 <br /> FINDING OF FACT: <br /> 1. Applicant wishes to construct boathouse by excavating into <br /> steep bank. <br /> 2. By removing portion of existing deck to achieve 10 foot <br /> separation with boathouse and 4 foot minimum sideyard can be <br /> utilized. <br /> 3. Boathouse is proposed to be 28 ' X 28 ' to accommodate owners <br /> watercraft. <br /> 4. Rear wall of boathouse will act as retaining wall to solidify <br /> bank. <br /> 5. Engineering provided by Nick George P.E. <br /> CONCLUSION: <br /> 1. The project as planned with specified conditions will not <br /> result in substantial detriment to navigable waters by erosion, <br /> sedimentation, impairment of fish or aquatic life, or safe and <br /> healthful conditions. <br /> Motion carried 4-0. <br /> #2517 Reed - Dunn 5/26/94 P.H. <br /> IN FAVOR: G. Reed OPPOSED: --- COMMUNICATION --- <br /> Quackenbush/Klopp to grant amended request for sideyard variance as <br /> proposed. Quackenbush - Aye, Dreps - No, Klopp - Aye, Gaskill - <br /> Abstain <br /> Motion failed. <br /> Dreps/Klopp to hold appeal in abeyance until July hearing. <br /> Motion carried 4-0. <br /> CONDITIONS: <br /> #2519 Koth - Westport 5/26/94 P.H. <br /> IN FAVOR: R. Koth & E. Solner OPPOSED: --- COMMUNICATION: --- <br /> Gaskill/Dreps to grant with conditions permit to fill and grade as <br /> proposed to alleviate drainage problems for this lot. <br /> Motion carried 4-0. <br /> Dreps/Klopp to grant reconsideration of setback variance granted <br /> (5/26/94) to allow residence garage to be constructed 12 feet from <br /> right of way of Hidden Circle (Variance = 18 ' from required <br /> setback) . <br /> Motion carried 4-0. <br /> CONDITIONS: <br /> 1. That plans and specifications be prepared by a licensed BOA <br /> engineer within the scope of the application, and filed with the <br /> Zoning Department before commencement of any work. <br /> 2 . That all work be performed in compliance with approved <br /> engineering standards and all applicable governmental rules and <br /> regulations particularly Sec. 11. 05 (4) of DCO. <br /> 3 . That there be filed with the Zoning Department a certificate of <br /> compliance by a licensed engineer at the completion of the project. <br /> 4 . Inspection and approval by Zoning Department upon completion of <br /> project. <br /> 5. Completion and certification deadline is October 1, 1994 . <br />