Laserfiche WebLink
BOA 5/26/94 MIN <br /> PAGE 8 <br /> 6) . Subject to receiving all other necessary governmental agency <br /> approvals. <br /> FINDING OF FACT: <br /> 1) . Adjoining property has been granted similar approval and <br /> project will tie into. <br /> 2) . Project intended to stabilize bank and prevent further <br /> erosion. <br /> 3) . Engineering work provided by Cleveland Gombar P.E. <br /> CONCLUSION: <br /> 1) . The project as planned, with specified conditions; will not <br /> result in substantial detriment to navigable waters by erosion, <br /> sedimentation, impairment of fish or aquatic life, or safe and <br /> healthful conditions. <br /> Motion carried - 4-0. <br /> #2522 . Appeal by George and Maria Colletti for a variance from <br /> setback to normal high watermark as provided by Section 11. 03 (2) to <br /> permit in-ground swimming pool addition to single family residence <br /> and also for a Special Exception Permit as provided by Section <br /> 11. 05 (3) to permit filling, grading, etc. within 300 feet of Lake <br /> Mendota at 5878 Cedar Wood Court in the NE 1/4 NE 1/4 - Section 5, <br /> South - Town of Westport. <br /> IN FAVOR: R. Hanschke OPPOSED: --- COMMUNICATION: Town <br /> Board, County Highway <br /> * Applicant withdraws variance request at public hearing. <br /> KLOPP/DREPS to grant, with conditions, permit to fill, grade and <br /> retaining walls, as proposed, inconjunction with swim pool <br /> construction. <br /> CONDITIONS: <br /> 1) . That plans and specifications be prepared by a licensed <br /> engineer within the scope of the application, and filed with the <br /> Zoning Department before commencement of any work. <br /> 2) . That all work be performed in compliance with approved <br /> engineering standards and all applicable governmental rules and <br /> regulations particularly Section 11. 05 (4) of Dane County Zoning <br /> Ordinance. <br /> 3) . That there be filed with the Zoning Department a certificate <br /> of compliance by a licensed engineer at the completion of the <br /> project. <br /> 4) . Inspection and approval by Zoning Department upon completion <br /> of project. <br /> 5) . Completion and certification deadline by August 1, 1994 . <br /> FINDING OF FACT: <br /> 1) . Project approval based on amended plan dated 5/25/94 . <br /> 2) . By reducing pool size and reconfigurating location variance <br /> from normal high watermark was not needed. <br /> r,r 3) . Engineering submitted by Max Koletzke Jr. , P.E. <br />