Laserfiche WebLink
(or Page 7 <br /> BOA - Minutes/8/26/93 <br /> required lot width at building setback line as provided by Sections <br /> 11. 03 (1) and 10. 05 (4) (b) to permit new residential construction at <br /> 4216 Morris Park Road being Lot #1, CSM 7163 in the NE 1/4 SE 1/4 <br /> Section 8 and the NW 1/4 SW 1/4 - Section 9, Town of Dunn. <br /> IN FAVOR: Staff OPPOSED: --- COMMUNICATION: Town Board <br /> GASKILL/DREPS to grant variance of 50. 22 feet from minimum reqired <br /> lot width at the building line to permit proposed residential <br /> construction. <br /> FINDING OF FACT: <br /> 1) . Variance #2409 granted (6/24/93) for reduced setback from road <br /> and both sideyards to construct as proposed. <br /> 2) . Appeal is to "house-clean" for lot width not legally noticed <br /> with previous variances. <br /> 3) . Property is in an area of numerous nonconforming lots with <br /> numerous variances being granted. <br /> CONCLUSION: <br /> 1) . Variance is not contrary to rights of others or to the public <br /> interest. <br /> 2) . Variance preserves the zoning ordinance as much as possible <br /> without injustice to applicant. <br /> Motion carried - 5-0. <br /> #2434 . Appeal by Dale Jaeger, agent for Bishop' s Bay Country Club <br /> for a Special Exception Permit as provided by Section 11. 05 (3) to <br /> permit filling, grading, etc. , within 300 feet of Lake Mendota in <br /> the W 1/2 NE 1/4 - Section 5 South, Town of Westport. <br /> IN FAVOR: D. Jaeger OPPOSED: --- COMMUNICATION: Town Board, <br /> County Highway Department. <br /> ................................................. <br /> GASKILLfLYNCH to grant, with conditions, permit to fill and grade <br /> within 300 feet of Lake Mendota for golf course construction as <br /> proposed. <br /> CONDITIONS: <br /> 1) . That plans and specifications be prepared by a licensed <br /> engineer within the scope of the application, an filed with the <br /> Zoning Department before commencement of any work. <br /> 2) . That all work be performed in compliance with approved <br /> engineering standards and all applicable governmental rules and <br /> regulations particularly Section 11. 05 (4) of Dane County Zoning <br /> Ordinance. <br /> 3) . That there be filed with the Zoning Department a certificate <br /> of compliance by a licensed engineer at the completion of the <br /> project. <br /> 4) . Inspection and approval by Zoning Department upon completion <br /> of project. <br /> 5) . Any earth disturbance this Fall (1993) be completed and <br />