|
Help
|
About
|
Sign Out
Home
Browse
Search
1996
DaneCounty-Planning
>
Zoning
>
BOA
>
BOA Minutes
>
1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2016 9:51:44 AM
Creation date
6/16/2016 9:50:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4risof BOA MINUTES 1/25/96 <br /> Page 7 <br /> CONCLUSION: <br /> 1) . The project as planned, with specified conditions; will <br /> not result in substantial detriment to navigable waters by <br /> erosion, sedimentation, impairment of fish or aquatic life, <br /> or safe and healthful conditions . Motion carried 4-0 . <br /> #2699. Dvorak - Dunn - 12/28/95 P.H. <br /> IN FAVOR: B. Dvorak OPPOSED: --- COMMUNICATION: --- <br /> Sayles/Gaskill to grant, with conditions, permit to fill, <br /> grade and retaining wall associated with new residential <br /> construction and lot drainage. <br /> CONDITIONS: <br /> 1) . Rip-rap and lower lakeside disturbance done prior to <br /> April 1, 1996. <br /> 2) . Landward and around residential grading by July 1, `96. <br /> 3) . Final completion and certification, by professional <br /> engineer by August 1, `96. <br /> 4 . That plans and specifications be prepared by a licensed <br /> engineer within the scope of the application, and filed with <br /> the Zoning Department before commencement of any work. <br /> 5. That all work be performed in compliance with approved <br /> engineering standards and all applicable governmental rules <br /> and regulations particularly Section 11 . 05 (4) of Dane County <br /> Code of Ordinances. <br /> 6. That there be filed with the Zoning Department a <br /> Certificate of compliance by a licensed engineer at the <br /> completion of the project. <br /> 7 . Subject to all other necessary governmental agency <br /> approvals . <br /> 8 . Inspection and approval by Zoning Department upon <br /> completion of project. <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.