Laserfiche WebLink
tre <br /> BOA - 10/26/95 Minute <br /> / s <br /> Page 2 <br /> 5) . Inspection and approval by Zoning Department upon <br /> completion of project. <br /> 6) . Completion and certification deadline of November 10, <br /> 1995. <br /> 7) . Existing spoil piles spread and leveled outside of <br /> shoreland, flood zone and wetland areas . <br /> Finding of fact: <br /> 1) . Applicant upgraded a pre-existing road thrggah wetland <br /> that existed 20± years 1 j�7�4/z<j��l!/ 'U4t f tbros44.7TA-g5of-6- TO • <br /> 2) . Applicant brought in 10± truck loads of crushed rock to Mgr 76 <br /> traverse 400± feet of wetland. <br /> 3) . Section 11 . 08 (1) permits roads in wetland areas for <br /> agricultural/silvicultural purposes . <br /> 4) . Road improvement for new residence construction and <br /> agricultural uses . <br /> 5) . Culverts under new drive do not connect to creek, <br /> thusly not a tributary of East Branch Blue Mounds <br /> Creek. <br /> 6) . Flood zone permit is pending. <br /> CONDITIONS: <br /> 1) . The project as planned, with specified conditions; will <br /> not result in substantial detriment to navigable waters <br /> by erosion, sedimentation, impairment of fish or <br /> aquatic life, or safe and healthful conditions . <br /> Motion carried - 4-0 . <br /> #2674 . Appeal by Bruce and Theresa Flaig for a Special <br /> Exception Permit as provided by Section 11 . 05 (3) to permit <br /> filling, grading, etc. , within 300 feet of tributary to <br /> Garfoot Creek in the SE 1/4 SW 1/4 Section 17, Town of Cross <br /> Plains . <br /> IN FAVOR: B. Flaig, H. Krantz OPPOSED: --- <br /> COMMUNICATION: --- <br /> GASKILL/SAYLES to hold requested permit until November <br /> Hearing to allow applicant to revise plans to reflect <br /> change in plans . Motion carried - 4-0. <br />