Laserfiche WebLink
.' State of Wisconsin PORTABLE SOURCE RELOCATION APPLICATIO <br /> Department of Natural Resources Form 4500-25 Rev.11=84 <br /> Bureau of Air Management <br /> Box 7921 <br /> Madison. Wisconsin 53707 <br /> To Owners of Portable Asphalt Plants or Other Portable Air Pollution Sources: <br /> Approval is required before relocating an asphalt plant or other portable source to a new site(section NR 154.055.Wis. Adm.Code).The plant <br /> must continue to meet the emission limits and not cause dust or other air pollution problems at the new location. Please complete this page of <br /> this form and send to the DNR District Office in the district in which your company is located AT LEAST 30 DAYS PRIOR TO MOVING. A <br /> Department representative may inspect both the proposed site and the portable source.You will be notified if there are any special restrictions <br /> at the new location. PLEASE INFORM THE DNR DISTRICT OFFICE WHEN THE ANTICIPATED OR ACTUAL START UP IS KNOWN. <br /> 1. Description of Plant to be Moved Owner's Plant Number or Name Type of Air Pollution Control Equipment <br /> ❑ Asphalt Batch&Continuous Control 26 I Bag House <br /> 21 Asphalt Drum Mix Rated Capacity.Tons/Hr.or BTU/Hr. Make and Model of Control Equipment <br /> ❑ Concrete Batch Plant 400 Tons/Hr. Bituma PB 7006 <br /> O Boiler or Heating Plant Make and Model Comments <br /> 402 Bituma Store <br /> ❑ Electric Generator <br /> DNR Air Permit Number(if known) <br /> ❑ Other(describe) 999460440 <br /> 2. Plant is presently located !give road names, distances.etc.. or attach plat map with location noted). <br /> Plant will corm from the Hess property located on the W 1/2 of the SW 1/4 of <br /> Section 2 (T3ON-R11E) <br /> Rollins Township, Lanalade Cot: <br /> 3. Proposed site location is tgive road names,distances.etc.. or attach plat map with location noted). <br /> Plant will move to the property located in the N 1/2 of the S 1/2 of <br /> Section 16 (T8N-R12E) <br /> Medina Township, Dane Cot <br /> 4. <br /> Anticipated date of start up is April 1 5, 1 991 Plant will be open <br /> approximately i 2 hours per day, 6 days per wee <br /> approximately weeks at this site. <br /> Is the plant able to process recycled asphalt? © Yes ❑ No <br /> Will recycled asphalt be used on this job? ❑ Yes © No <br /> If yes,what is the ratio or percent of recycle in the mix? <br /> Will sulfur-extended mix be used in this lob? ❑ Yes ® No <br /> 5. Company and person responsible for operation. <br /> Company name Contact Person(name) <br /> Payne & Dolar. nc_ Kurt Bechthold <br /> Street or route Title <br /> P.O. Box 781 Project Manager <br /> City,state, zip code Telephone number(include area code) <br /> Waukesha, WI 33187 (414) 524-1769 <br /> Si.• e o p n •r for; Date signed <br /> i <br /> MAUI— 2-25-91 <br />