|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02346
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 1:32:07 PM
Creation date
7/6/2016 1:30:45 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02346
Town
Christiana Township
Section Numbers
14
AccelaLink
DCPCUP-2016-02346
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> c" <br /> h. Identify all major proposed haul routes to the nearest Class A highway or truck route. <br /> Indicate traffic flow patterns. <br /> The applicant and/or operator will not haul over Koshkonong <br /> pp p o g Road or any town road. All <br /> trucks hauling aggregate will exit the subject property to the south by using the private <br /> "haul road", which was constructed over and through the property directly to the south. <br /> The "haul road" intersects with County Hwy B, wherefrom trucks will travel to other <br /> county, state and/or federal highways. <br /> i. ''Proposed phasing plan (recommended for larger sites) <br /> As you will see on the map attached hereto as Tab #6, there are no specific times and/or t._ <br /> deadlines regarding the extraction of limestone. Instead, extraction will occur on an as- Uv/" <br /> needed basis and will begin by moving south and east,with final extraction taking place to <br /> the southwest of the existing quarry. The pace of extraction will be largely dependent upon <br /> the need of the DOT as it relates to the Project. <br /> j. Types, quantities and frequency of use of equipment to extract,process and haul. <br /> a' <br /> In addition to multiple dump trucks, graders, and excavators, we anticipate the need for a e s ^ j <br /> portable crushing plant onsite from March through December. ` <br /> k. Frequency of blasting, drilling, mining, crushing, screening, washing, refueling. <br /> Based upon the need of the DOT as it relates to the Project, it is our rough estimate that <br /> blasting will occur onsite approximately 30 times per year. Crushing will likely occur on <br /> a continual basis. However, as needs change, this could be increased or decreased. <br /> 1. Bulk fuel storage. <br /> There will be no bulk fuel storage on the subject property. <br /> m. Asphalt batching or concrete mixing. <br /> There will be no asphalt batching or concrete mixing on the subject property. <br /> :_l_.)Proposed storage of recycled materials. <br /> It is the intent of the applicant and/or operator to recycle, crush and sell any recycled <br /> materials, including specifically concrete and asphalt. :4'/Op <br /> tC <br /> .,.. <br /> o. Does extraction occur below the water table/protection of groundwater? <br /> It is not the intent of the applicant and/or operator to conduct extraction below the water <br /> 1 table. <br /> -3- <br /> C <br />
The URL can be used to link to this page
Your browser does not support the video tag.