Laserfiche WebLink
Permanent or temporary p. po ary structures. <br /> 1^‘ <br /> Other than the owner's residence,which is located directly to the south of the non-metallic <br /> quarry operation, there also exists a temporary office trailer. <br /> q. Spill prevention and or dust control. <br /> The applicant recently installed and will maintain an asphalt driveway and road. The <br /> applicant and/or owner will also use water bars during production. -- . <br /> r. Proposed use after final reclamation as consistent with Ch. 74. Separate checklist for <br /> reclamation permit. <br /> As indicated on the map attached hereto as Tab #6, there will be a four (4) acre, four (4) <br /> foot deep retention pond to the north of the existing quarry operation. The remaining <br /> portion of the property will be returned to agricultural use. <br /> I <br /> -4- <br />