|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02346
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2016 1:32:07 PM
Creation date
7/6/2016 1:30:45 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02346
Town
Christiana Township
Section Numbers
14
AccelaLink
DCPCUP-2016-02346
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br /> Non-metallic Mining Reclamation <br /> Application Checklist <br /> 1 <br /> Applicant Zoning LCD <br /> Plan Requirement I Location in Plan-page number I I <br /> 1. Site information-maps of the site including the general location,property <br /> boundaries,aerial extent,geologic composition and depth of the deposit,the Page 1 <br /> distribution,thickness and type of soil,the approximate elevation of ground <br /> water,the location of surface waters and the existing drainage patterns. <br /> 2. Biological resources-plant communities and wildlife use at and adjacent <br /> to the site. Page 1 <br /> 3. Existing topography-contour maps of the site at ten foot contour intervals. Page 1 <br /> 4. Location of manmade features on or near the site. Page 1 <br /> 5. Plan view-(existing mines)showing the location and extent of land <br /> previously affected by non-metallic mining for existing sites. Page 1 <br /> 6. Post-mining land use-consistent with local land use plans/local zoning. Page 1 <br /> 7. Under exclusive agricultural zoning? Page 1 <br /> 8. Reclamation measures-description of the proposed reclamation,including <br /> methods and procedures to be used and a proposed schedule for the <br /> completion of reclamation. Page 1 &2 <br /> 9. Proposed earthwork and reclamation-final slope angles,high wall <br /> reduction,benching and terracing. Page 2 <br /> 10.Methods of topsoil-topsoil substitute material removal and storage. Page 2 <br /> 11.Anticipated topography of the reclaimed site. Page 2 <br /> 12.Plan map that shows surface structures-after the cessation of mining. Page 2 <br /> 13.Estimated cost of reclamation. Page 2 <br /> 14.Revegetation plan-shall include timing and methods of seed bed <br /> preparation,rates and kinds of soil amendments,seed application timing, <br /> methods and rates,mulching and any other techniques needed to accomplish <br /> soil and slope stabilization. Page 2 <br /> 15.Standards for revegetation-may be based on the percent of vegetative <br /> cover,productivity,plant density,diversity or other applicable measures. Page 2 <br /> 16.Erosion control and stormwater-chapter 14 requirements. Page 3 <br /> 17.Description of interim reclamation. Page 3 <br /> 18.Financial assurance-$1500/acre. Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.