Laserfiche WebLink
I <br /> Non-metallic Mining Reclamation <br /> Application Checklist <br /> I <br /> Plan Requirement: <br /> I1. Site information — maps of the site including the general location, property boundaries, <br /> aerial extent,geologic composition and depth of the deposit,the distribution,thickness and <br /> I type of soil, the approximate elevation of ground water,the location of surface waters and <br /> the existing drainage patterns. <br /> See Tab#6. <br /> I2. Biological resources—plant communities and wildlife use at and adjacent to the site. <br /> I Surrounding areas are almost exclusively agricultural and are used for the growing and <br /> harvesting of crops, which include without limitation corn, soybeans, wheat and alfalfa. <br /> 1 3. Existing topography—contour maps of the site at ten foot contour intervals. <br /> See Tab#14. <br /> I4. Location of manmade features—on or near the site. <br /> I Other than an existing residence and retention pond located on the subject property and a <br /> utility grid owned by American Transmission Company LLC directly across Koshkonong <br /> Road, there is no manmade feature that is directly adjacent to the subject property. <br /> I5. Plan view— (existing mines) showing the location and extent of land previously affected <br /> by non-metallic mining for existing sites. <br /> ISee Tab#6. <br /> I6. Post-mining land use—consistent with local land use plans/local zoning. <br /> It is the intent of the owner and/or operator to return the subject property to agricultural use <br /> I after extraction has been completed as specified in the Reclamation Plan*, which is <br /> included herein as Tab#11. <br /> 7. Under exclusive agricultural zoning? <br /> Yes. <br /> 1 8. Reclamation measures — description of the proposed reclamation, including methods and <br /> procedures to be used and a proposed schedule for the completion of reclamation. <br /> I <br /> I - 1- <br />