Laserfiche WebLink
1 <br /> See Reclamation Plan included herein as Tab #11. Generally, reclamation will occur on <br /> an ongoing basis as areas of the subject property are no longer needed for extraction or <br /> storage. Until final reclamation, which will occur upon complete extraction of limestone <br /> or the expiration of the CUP, whichever is earlier, reclamation will simply include <br /> smoothing of soil and planting of vegetation. <br /> ' 9. Proposed earthwork and reclamation — final slope angles, high wall reduction, benching <br /> p g i g � g <br /> and terracing. <br /> See Reclamation Plan included herein as Tab#11. Generally,the reclamation will include <br /> 3:1 slopes and back slopes with no benching. <br /> 10. Methods of topsoil—topsoil substitute material removal and storage. <br /> See Reclamation Plan included herein as Tab#11. Generally,we intend to strip, stockpile <br /> and replace when reclamation is appropriate. <br /> 1 11. Anticipated topography of the reclaimed site. <br /> See Reclamation Plan as Tab#11. Generally we will proceed with 3:1 slopes with at least <br /> one inch (1") of subsoil and four inches (4") of topsoil. <br /> 12. Plan map that shows surface structures—after the cessation of mining. <br /> The applicant does not anticipate any surface structures. <br /> 13. Estimated cost of reclamation. <br /> It is estimated that the cost of reclamation will be approximately $200,000. <br /> 14. Revegetation plan — shall include timing and methods of seed bed preparation, rates and <br /> kinds of soil amendments, seed application timing, methods and rates, mulching and any <br /> other techniques needed to accomplish soil and slope stabilization. <br /> See Reclamation Plan as Tab#11. Generally we will proceed with 3:1 slopes with at least <br /> one inch (1") of subsoil and four inches (4") of topsoil. <br /> 15. Standards for revegetation—may be based on the percent of vegetative cover,productivity, <br /> plant density, diversity or other applicable measures. <br /> See Reclamation Plan as Tab #11. Generally, we will slope at 3:1 and provide cover that <br /> is consistent with the surrounding agricultural uses. <br /> -2- <br />