Laserfiche WebLink
I <br /> 16. Erosion control and storm water—chapter 14 requirements. <br /> p q ements. <br /> ISee the Erosion Control Plan included herein as Tab#10. <br /> 17. Description of interim reclamation. <br /> I <br /> Pursuant to the existing conditional use permit and the MSHA berm requirements, the <br /> I applicant and/or operator will continue to reclaim those portions of the subject property <br /> that have been extracted and that are no longer needed for storage of aggregate by leveling <br /> and appropriately sloping the excavated area and planting vegetation on the same. <br /> I18. Financial assurance - $1500/acre. <br /> See letter of credit, included herein as Tab#13. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> *The Reclamation Plan that is referenced throughout this narrative relates to the original <br /> I conditional use permit that was issued for the subject property (#1262). If required, the <br /> operator will work with Dane County to file a revised and updated reclamation plan. <br /> 3- <br />