|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-00927
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-00927
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2016 9:35:08 AM
Creation date
7/11/2016 9:35:06 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
00927
Town
Dunkirk Township
Section Numbers
2
AccelaLink
DCPCUP-0000-00927
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
F. C. RAEMISCH & SON INC. <br /> FRANK C.RAEMISCH,Founder <br /> THOMAS F.RAEMISCH <br /> 1879-1959 Transportation Contractors and Site Developers 608-833-1629 <br /> GERALD J.RAEMISCH 109 N.MADISON STREET • P.O.BOX 366 GERALD C.RAEM1SCH <br /> 1908-1977 WAUNAKEE,WI 53597-0366 608-231-3131 <br /> Tel.608-849-5721 • FAX 608-849-8794 <br /> April 4, 1991 <br /> Dane County Land Regulation and Records <br /> Room 116, City-County Building <br /> Madison, WI 53709 <br /> Attention: Mr. Steve Reynolds <br /> Subject: Conditional Use Permit <br /> Project #5845-02-71 <br /> The undersigned hereby applies for a conditional use permit for a govern- <br /> ment use-borrow extraction pit, for construction of Highway "51" in Dane <br /> County. <br /> The property is owned by Oscar M. and Shirley Linnerud and is located <br /> along Hwy. "51" in the Town of Dunkirk, more fully described as follows; <br /> Part of the NEt-SE'-SW's of Section 2, T5N-R11E, consisting of 12 acres , <br /> more or less. "I <br /> This site will be used for fill material on State Highway "51" project <br /> 5845-02-71. <br /> All topsoil will be salvaged, replaced and seeded in accordance with the <br /> Wisconsin Division of Highway Specifications. <br /> When excavation of site is completed, the site will be shaped for drain- <br /> age and blended into the adjacent areas. <br /> All work on this site will be in conjunction with Hwy. "51" construction, <br /> which is expected to be completed in the Fall of 1991. <br /> Attached is a site plan showing existing and proposed contours. <br /> If you have any questions concerning this application, please call our <br /> office. <br /> Sincerely yours, <br /> F. C. Raemisch & Son, Inc. <br /> B Owner: <br /> Y: <br /> President Name. eke-�fl ' <br /> Street mp 91f d - <br /> City & State 44,146.:Aw%o, -V <br /> Phone • 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.