|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00045
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2016 3:54:11 PM
Creation date
7/19/2016 4:19:34 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00045
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09-18-'08 08:51 FROM-Town of Verona 6088457143 T-362 P006/007 F-772 <br /> Town of Verona B: 845-7187 <br /> 335 N. Nine Mound Rd Fax: 845-7143 <br /> Verona, WI 53593-1035 www.town.verona.wi.us <br /> *Inspections Call—(608) 845-7187 <br /> • <br /> Property Ow er Applicant: Pat►e;105/01108 <br /> bo r a<:`Inc` Same as Owner Permit No !8� 5< a <br /> ona, r <br /> t � v <br /> APPROVAL CONDITIONS <br /> �' <br /> 1. ZONING PERMIT FEES are paid to Dane County Zoning. <br /> 2. LICENSED ELECTRICIAN IS CRITICAL. A$25.00 annual ($15.00 renewal) <br /> license fee and copy of your electrician's state master electrical certificate are required <br /> before an electric permit can be issued. <br /> 3. The name and license number of the Wisconsin MASTER PLUMBER is critical. <br /> 4. Construction costs includes labor and materials. <br /> 5. The BUILDING INSPECTOR is responsible for estimating construction costs,utilizing <br /> information provided by permit applicant. <br /> 6. It is your responsibility to SCHEDULE ALL REQUIRED INSPECTIONS during and <br /> after construction. Inspections are required before any work is covered up. <br /> 7. All REQUESTS FOR INSPECTIONS shall be called into doh.n Crook(Town of <br /> Verona Commercial Building Inspector) at 845-7187,(Mon.-Fri.),8am-200pm. <br /> 8. The building inspector shall perform a requested inspection within(2)BUSINESS <br /> DAYS after notification,except the final inspection. <br /> 9. If a REINSPECTION is necessary because the work was not completed when the <br /> inspection was called in, or if there is a code violation,or any additional and"partial" <br /> inspections are called for,there will be an additional recall fee for re-inspection to be <br /> collected before the finals are approved. This fee shall be made payable to the Town <br /> of Verona. <br /> • <br /> 10. NO ENTRY. If the inspector visits a property and is unable to reinspect any items listed <br /> on the official notice,the reinspections classified as a no entry. No entry situations <br /> usually occur after the owner or manager declines to make an appointment for <br /> reinspection. There will be a no entry re-inspection fee to be collected before the finals <br /> are approved. This fee shall also be made payable to the Town of Verona. <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.