|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00045
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2016 3:54:11 PM
Creation date
7/19/2016 4:19:34 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00045
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09-18-'08 09;45 FROM-Town of Verona 6088457143 T-363 P003f005 F-773 <br /> G <br /> B: 845-7187 <br /> Town of Verona <br /> Fax: 845-7143 <br /> 335 N. Nine Mound Rd v,�,y�,,,to,Nn.verona.wi.us <br /> Verona,WI 53593-1035 <br /> *Inspections Call- (608) 845-7187 <br /> Applicant: Date: 44121/08 <br /> a Permit No.08 <br /> Same as Owner 08-13 <br /> Ana, " 53559 <br /> APPROVAL CONDITIONS <br /> 1. ZONING PERMIT FEES are paid to Dane County Zoning. <br /> 2. This permit is issued only for EARLY START CONSTRUCTION FOOTINGS & <br /> FOUNDATION before the plans and specification ding have been <br /> submitted. The applicant shall proceed at the applicant's own risk with the building <br /> operation and without assurance that a permit for the entire structure will be granted. <br /> 3. Permit Requirements still needed for Building Permit: <br /> • The 1972 plans submitted are for the Waun-A-Bowl in Waunakee,a pre- <br /> engineered structure that has been erected once. Snow loads and wind loads have <br /> changed. Property owner indicated the building was taken down from the old <br /> bowling alley in Lodi. Town of Verona Building code provision requirement VII I(2) <br /> states plans shall be prepared in accordance P <br /> bear the mame of the architect engin��1 r medic indicated the nature and character any, <br /> the <br /> and shall be of sufficient clarity to clearly <br /> work proposed. <br /> royal still needed p to <br /> POWTS (private on site waste treatment system) approval still <br /> needs to prior <br /> any plumbing work installed in the edapplication.building. <br /> btained thru Dane Co. <br /> shown on Box 10 of the building permit <br /> • Complete set of interior plans needed showing the bathroom and office location. <br /> The permit application VII(1)shall contain the name,mailing address,phone and <br /> or is the <br /> license number of the contractor responsible ners obtaining building lding permit tmust be <br /> owner,then a cautionary statement to owners <br /> �-�- signed. <br /> renewal) <br /> 4. LICENSED ELECTRICIAN IS CRITICAL. A$25.00 annual l ($15.00 <br /> ate are required <br /> license fee and copy of your electrician's state master <br /> before an electric permit can be issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.