|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2009-00045
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2009
>
DCPZP-2009-00045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2016 3:54:11 PM
Creation date
7/19/2016 4:19:34 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2009-00045
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09-18-'08 09;45 FROM-Town of Verona 6088457143 T-363 P004/005 F-773 <br /> • 5, <br /> The name and license number of the Wisconsin MASTER PLUMBER is critical. <br /> 6. Construction costs includes labor and materials. <br /> 7. The BUILDING INSPECTOR is responsible for estimating construction costs,utilizing <br /> information provided by permit applicant. <br /> B. It is your responsibility SCHEDULE ALL REQUIRED INSPECTIONS during and <br /> �'to <br /> after construction. Inspections are required before any work is covered up. <br /> 9. All REQUESTS FOR INSPECTIONS shall be called into ook 200pmof <br /> Verona Commercial Building Inspector) at 845-7181,(Mon.-Fri.), <br /> 10. The building inspector shall perform a requested inspection within(2)BUSINESS <br /> DAYS after notification,except the final inspection. <br /> 11. If a REINSPECTION is necessary because the work was not completed when he <br /> inspection was called in,or if there is a code violation,or any <br /> e <br /> inspections are called for,there will be an additional recall fee for -inspo the to be <br /> collected before the finals are approved. This fee shall be made payable <br /> of Verona. <br /> 12, NO ENTRY. If the inspector visits a property <br /> and is unable to reinspect any items listed <br /> on the official notice,the reinspections classified as a no entry. No entry situations <br /> e <br /> usually occur after the owner or manager declines to make an appointment for <br /> reinspection. There will be a no entry re-inspection fee to be collected before the finals <br /> are approved. This fee shall also be made payable to the Town of Verona. <br /> . - ._ ..... <br /> Cl Footi Inspection—After footings are dug and reinforcing in p lace but before concrete is/ <br /> poured. (Building Inspector). Inspection Requested Date/Time <br /> tiles <br /> p Foundation Ins ection r After walls are poured but waterproofing ilnsulati0on hall be <br /> (when required)shall be in place and foundation rp roofing and <br /> applied. - (Building Inspector). Inspection Requested Date/Time <br /> 11 All structures constructed without a building p ermit will be charged twice the rate/fee for <br /> of <br /> all after-the-fact permits issued. In other words,failure to obtain a permit and payment <br /> before commencing work will DOUBLE the fees. <br /> 12. Any unauthorized change from the information or plans submitted could aa se�'STOP <br /> WORK ORDER or a SUSPENSION� af ust be completechanges nd submitted to the <br /> CHANGE ORDER(updated p a order form. <br /> Building Inspector, Please contact the Town of Verona Office for a change <br />
The URL can be used to link to this page
Your browser does not support the video tag.