|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-00952
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-00952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2016 12:17:16 PM
Creation date
7/28/2016 12:17:13 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
00952
Town
Oregon Township
Section Numbers
7
AccelaLink
DCPCUP-0000-00952
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t <br /> Titaiw R4 Gite*114 <br /> Registered Land Surveyor <br /> ci 'iliii <br /> 114 South Main Street • Verona, Wisconsin 53593 • (608) 845-6882 <br /> Subdivision Design • Rural Surveys • Soil Testing • Land Planning <br /> DANE COUNTY LAND REGULATION & RECORDS <br /> AUGUST 5, 1991 <br /> ATTN: MR. WILLIAM FLECK, ZONING ADMINISTRATOR <br /> ROOM 116, CITY-COUNTY BUILDING <br /> MADISON, WI. 53709 <br /> RE: CONDITIONAL USE PERMIT APPLICATION FOR MINERAL EXTRACTION OPERATION LOCATED <br /> IN THE W1/2 OF THE SE1/4 OF SECTION 7, T5N, R9E, TOWN OF OREGON, DANE COUNTY, <br /> WISCONSIN. <br /> DEAR SIR, <br /> PROPOSED USE OF THE PROPERTY IS A MINERAL EXTRACTION OPERATION. THE TIME SCHEDULE <br /> FOR DEVELOPMENT IS IMMEDIATE AND THE TERMINATION WILL BE IN 5 YEARS. <br /> THE SITE IS SUITABLE FOR THE INTENDED PURPOSE BECAUSE THE LANDS CONTAIN A MINERAL <br /> DEPOSIT THAT CAN BE UTILIZED FOR PURPOSES FROM BEDDING SANDS TO CONSTRUCTION AGGRE- <br /> GATES 'OF BASE COURSE, ASPHALTIC AND PORTLAND CEMENT. SEE ATTACHED LETTER BY ROBERT <br /> J, FAUSETT, ENGINEERING GEOLOGIST. <br /> VEHICULAR ACCESS. FOR THIS PROJECT WILL BE LIMITED TO THE EASTERLY 50 FEET OF THE <br /> SITE DIRECTLY ON TO COUNTY TRUNK HIGHWAY' 'p' ; A FULLY IMPROVED COUNTY HIGHWAY. <br /> MINING EXTRACTION OPERATIONS WILL BEGIN ON THE SOUTHERLY END OF THE SITE AND THE <br /> TOPSOIL FROM THE EXCAVATED AREA WILL BE STOCKPILED ON THE NORTHERLY' END OF THE SITE <br /> FOR RECLAMATION. PRACTICAL EROSION CONTROL PROCEDURES WILL BE IMPLEMENTED TO MIN- <br /> IMIZE EROSION OF THE STORED TOPSOIL UNTIL RECLAMATION IS COMPLETED. <br /> THE MTNERAL•EXTRACTION OPERATION WILL EXCAVATE TO A DEPTH AT LEAST 3 FEET BELOW <br /> THE WATER PRODUCING DEPTH, • <br /> THE MINERAL EXTRACTION OPERATION WILL NOT BE A WASHING OPERATION AND THE ON-SITE <br /> CRUS4ING OF MATERIAL WILL BE DEPENDENT UPON FURTHER SITE INVESTIGATION. <br /> THE EXCAVATED AREA WILL BE CLEARED OF ALL DEBRIS AND RECLAIMED AS A LAKE WITH THE <br /> AREA BETWEEN THE SHORELINE AND THE TOP OF THE EXCAVATION HAVING A SLOPE NO GREATER <br /> THAN 341 AND COVERED WITH TOPSOIL AND SEEDED TO PREVENT EROSION. <br /> THOM R. GRENLIE SURVEYOR'S <br /> •/«-' /g4A.Ae <br />
The URL can be used to link to this page
Your browser does not support the video tag.