Laserfiche WebLink
8. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur in the areas identified as "undisturbed" or "vegetated buffer" <br /> on the plan. In the event any of these areas are disturbed, additional erosion control <br /> measures will be required. <br /> 9. The plan includes a construction schedule as follows: <br /> Grading and construction is scheduled to begin on April 6, 2009. <br /> All disturbed areas must be restored with permanent seed and mulch (or erosion <br /> mat where noted) by May 13, 2009. <br /> The construction site will follow the plan according to the schedule approved by Dane County <br /> Land Conservation. This permit will expire on the stabilization date included in the plan <br /> (May 13,2009) and may be amended prior to permit expiration only. This review is for the <br /> shoreland erosion control requirements of Chapter 11, Dane County Code of Ordinances only and <br /> other approvals may be necessary. The applicant must obtain a permit card from the Land <br /> Conservation counter and display it on the site prior to disturbing ground. It is <br /> recommended that you contact the Land Conservation Division prior to picking up the permit <br /> card. <br /> Cc: Todd Halvensleben, P.E., Vierbicher Associates, Inc. (by email) <br />