|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-00824
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-00824
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2016 9:29:16 AM
Creation date
8/11/2016 9:29:14 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
00824
Town
Bristol Township
Section Numbers
23
AccelaLink
DCPCUP-0000-00824
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/./ , -" Z I <br /> • OFFICE PHONE 748-3035 <br /> Petersoll James Sons Inc. - - - <br /> Mobile Concrete <br /> P. O. BOX 120 - MEDFORD, WISCONSIN 54451 <br /> March 6, 1990 <br /> TO: DANE COUNTY ZONING BOARD <br /> FROM: James Peterson Sons, Inc. <br /> P. O. Box 120 <br /> Medford, WI 54451 <br /> SUBJECT: Request for a conditional use permit to allow <br /> excavation processes to occur on property <br /> zoned A-l. <br /> We are aski c for a request for a conditional use permit on <br /> the Violet �{ ; . property located as follows <br /> (refer to location map) : <br /> SE4 NE 4 and NE4 SE 4 and part of SE4 SE4 <br /> lying North of Branch Road, Sec. 23 , T9N, <br /> R11E of the 4th Principle Meridian all in <br /> Dane County, Wisconsin. 70-„, 2/ /3r es 7n <br /> Tax Parcel No. : 06-0911-231-9500-7 <br /> , Only the SEa NEa of said parcel be granted said permit. <br /> --� — • 860/ ex-6" sa r cC- pa rc.e/ 01-7 ly <br /> This request has arisen due to reconstruction of USH 151 <br /> between Sun Prairie and Columbus. We propose to excavate <br /> earthened material to meet. borrow requirements of the <br /> Wisconsin Department of Transportation persuant to Sec 208 <br /> of the Standard Specifications for Road and Bridge Construction, <br /> 1989 Edition. <br /> We propose to excavate 100-150,000 cubic yards of earthened <br /> material to be exclusively used for the reconstruction of USH 151 . <br /> Our plan is to excavate approximately 18 feet off of 20 acres <br /> from southeast to northwest to maintain positive drainage as it <br /> currently exists (refer to drainage map and cross-section drwg) . <br /> We would excavate 1/3 to 1/2 .of the proposed area per phase. <br /> This procedure reduces the amount of time that the area would <br /> be subject to erosion. The topsoil would be stripped off and <br /> stockpiled by the edges of the excavation. Silt fence shall be <br /> placed along the edges of the stockpile to minimize any possible <br /> damage from erosion (refer to site plan) . After the excavation <br /> in a particular phase has been completed, the topsoil shall be <br /> replaced to near its original thickness and seeded as directed in <br /> subsection 208 . 3 of said specifications. Also, if conditions <br /> arise, silt fence can be installed along the,southeastern limits <br /> of excavation to prevent siltation of adjoining property. <br />
The URL can be used to link to this page
Your browser does not support the video tag.