Laserfiche WebLink
• OFFICE PHONE 748-3035 <br /> S011 , 111€.Petorso Mobile Concrete <br /> P. O. BOX 120 - MEDFORD. WISCONSIN 54451 <br /> March 6 , 1990 <br /> Dane County Zoning Board <br /> Page 2 <br /> Final side slopes shall vary and the floor slopes towards the <br /> center at a variable slope. Currently, plans are not <br /> available for contractors to study, so it is difficult to <br /> determine the exact quantity required. <br /> The time schedule required would be in effect from May or <br /> June 1990 through November 1991 . Normally one construction <br /> season would be sufficient to complete projects of this size, <br /> but due to the lateness of the projects being let, two <br /> constructions seasons shall be required. <br /> We have received permission from the property owner to apply <br /> for a conditional use permit, and if the permit is approved, to <br /> excavate material from said property. <br /> We feel the excavation process that is going to be employed <br /> shall in no way affect land values or any other considerations <br />_, of adjacent properties. <br /> Sincerely, <br /> James Peterson Sons, Inc. <br /> James R. Peterson <br /> Secretary <br /> JRP:11 <br /> cc file <br /> _ <br />