Laserfiche WebLink
work lands . <br /> In this way little if any additional work land will have to <br /> be taken out of production than already is affected. <br /> Currently we stay back from the edge about 75 ' as we must <br /> watch for ravine erosion cutting into the field and washing <br /> down to the dump site following the natural area drainage <br /> pattern. <br /> We intend to establish permanent bench marks to control the <br /> slope grade excavation. It appears that a "total station" <br /> survey monumentation system is the most efficient way to <br /> accomplish this as per the recommendation of Mr . Arden <br /> Sandsness of George Wier & Assoc. Inc. <br /> A copy of the actual control monuments elevation and location <br /> will be provided the County Surveyor as may be requested. <br /> Your approval of this reclaimation and soil conservation plan <br /> is appreciated. <br /> Sincerely; / <br /> Walter J . Olson <br /> Property Owner <br /> Encl . Copy of re-zoning/CUP location map <br /> Copy of Town Dump Reclaimation grades <br /> Environmental Services Group letter <br /> Existing USGS topography <br /> Proposed redirection of surface waters <br /> 4 photos of existing spoil line <br />