Laserfiche WebLink
• <br /> • <br /> CONDITIONS FOR REMOVAL OF CLAY FROM STEVE AND COLETTE LINK PROPERTY <br /> CONDITIONAL USE PERMIT #717 <br /> sHa�� <br /> 1. Hauling.yi11 be on USH 12-18 to the Landfill. <br /> 2. Hauling..wi±l be limited to one season. <br /> 3. Approximately ten acres of land will be opened up for clay extraction at one time. <br /> When the excavation is complete on the first ten acres, the next ten acres will be <br /> stripped of topsoil. That topsoil will then be placed on the first ten acres <br /> stripped. This procedure will then be repeated for the following acres. After the <br /> topsoil is replaced, it will be graded and seeded. <br /> 4. Soil erosion control measures will be required and enforced. Siltation fences will <br /> be constructed as required. <br /> 5. Hours of operation be 6:30 a.m. to 5:30 p.m. Truck hauling will be limited to <br /> 7:00 a.m. to 4:00 p.m. The intent is that work days shall be Monday through Friday <br /> with the exception of an occasional Saturday for rain make-up. <br /> 6. A good faith effort will be made to leave several inches of clay on site. Surface <br /> of topsoil will be prepared prior to seeding such that roots could be established. <br /> 7. The land will be kept in grassland/hay production for an initial five year period <br /> to allow soil structure to become re-established, and to assure no harmful effects <br /> to area groundwater. <br /> 8. After this initial period, the reintroduction of a more intense land use such as <br /> row-crop agriculture may be allowed based on soil test results and committee approval. <br /> 9. The Town Board will be notified of any requested changes in land use. <br /> 10. Soil testing shall include remapping based on soil borings. In addition, test plots <br /> shall be done to determine yields on the rebuilt soil so future nitrogen can be <br /> closely tied to yield expectations. <br /> 11. Land use must follow State standards for nutrients and pesticides currently being <br /> set by the U.W., State and Federal agencies. (These standards will be in effect <br /> before a petition for a land use change can be made, and they will establish <br /> specific soil series application rates for agricultural chemicals for the entire <br /> State of Wisconsin. ) <br /> 12. All construction equipment and vehicles will be fueled and stored on land that has <br /> not had the clay removed. Farm equipment will also be stored and fueled on land <br /> that is not disturbed. <br /> 13. Once the clay has been excavated, the borrow area will be regraded to match the <br /> original topography and drainage patterns. Sandy loam subsoil materials will be <br /> backhauled from the Landfill to replace the excavated material. <br /> 14. Clay extraction will be limited to the deep, low-lying soils in the valley bottom. <br /> The steep, adjacent side-slopes will not be excavated. <br /> 2/28/89 <br />