Laserfiche WebLink
January 28, 1986 <br /> Page Two <br /> base, it will likely be cleaner than that which currently <br /> runs off, as the soil/rock will filter the water and <br /> cleanse it of silt and clay size particles (sediment) . <br /> 3. What effects will quarrying have on the existing landfill <br /> (including blasting)? <br /> - Effects on slope stability will be evaluated before <br /> blasting occurs. <br /> - No liner exists, so the liner will not be affected by <br /> blasting. <br /> - Quarrying is separate from the landfill area. <br /> - No landfill is proposed for the quarry area. <br /> Based upon your site visit and our meeting of January 27, 1986, we request <br /> your committee approve the rezoning and conditional use applications, as <br /> proposed, with the condition that if blasting is necessary, it will be with <br /> the consent and prior approval of Dane County Zoning and will be based upon a <br /> review and analysis suitable to Dane County Zoning in limits or effects on the <br /> closed landfill area. <br /> Very truly yours, <br /> CREATIVE RESOURC VENTURES, L o . <br /> '.. ---7 <br /> /� <br /> By: Mark Halleen, P.E. <br /> Program Manager <br /> Idi' )/ /'/Ii7 <br /> By: Robert T. Glebs, P.E. <br /> President <br /> jaj <br /> 1061.01:JAJ:debquarry <br />