|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2016-02367
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2016
>
DCPCUP-2016-02367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2016 3:01:23 PM
Creation date
12/21/2016 8:20:53 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02367
Town
Albion Township
Section Numbers
27
AccelaLink
DCPCUP-2016-02367
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Endpoint Solutions <br /> Proposed traffic patterns at the Facility are expected to follow Haugen Road to Hwy-51 from the <br /> northern half of the Site so as to eliminate traffic past residential parcels.One bi-direction driveway <br /> will be installed to minimize congestion and backups on the roadway. <br /> 6. THAT THE CONDITIONAL USE SHALL CONFORM TO ALL APPLICABLE REGULATIONS OF THE DISTRICT IN WHICH <br /> IT IS LOCATED. <br /> The proposed RMC batch plan will require a rezone from C-2 Commercial to A-2 Agricultural to <br /> allow the conditional use.However,the proposed operations have been planned to comply with <br /> applicable A-2 zoning and land development requirements including but not limited to setbacks as <br /> identified in Chapter 10; Section 10.126 of the Dane County Zoning Ordinance. <br /> CLOSING <br /> Endpoint,on behalf of Mr.Jon Halverson,is submitting the enclosed Conditional Use Permit <br /> application amendment for the proposed RMC plant along with the required attachments.If you <br /> have any questions/concerns or require additional information regarding any of the enclosed <br /> information,please contact Marie Venne at 414-858-2104. <br /> Sincerely, <br /> Endpoint Solutions <br /> Alex J.Mentzer,E.I.T. Marie M.Venne,P.E. <br /> Associate Engineer Senior Engineer <br /> cc: Jon Halverson,Property Owner <br /> [Enclosures] <br /> RMC Batch Plant Conditional Use Permit Amendment-Mr.Jon Halverson November 14,2016 <br /> Endpoint Project:393-002-001 Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.