Laserfiche WebLink
Endpoint Solutions <br /> 6871 South Lovers Lane <br /> Franklin,WI 53132 <br /> Telephone: (414)427-1200 <br /> Fax: (414)427-1259 <br /> www.endpointcorporation.com <br /> Mr. Dan Everson SEE <br /> Zoning Division <br /> Room 116,City-County Building <br /> 210 Martin Luther King jr.Blvd. <br /> Madison,WI 53703-3342 REVISE <br /> Subject: Ramsey Pit,LLC Conditional Use Permit Application <br /> 1404 Ramsey Road,Stoughton,Wisconsin <br /> Dear Mr.Everson: <br /> Endpoint Solutions Corp. (Endpoint),on behalf of Ramsey Pit, LLC (Ramsey Pit), is submitting the <br /> enclosed applications,drawings and supporting information for your review regarding the <br /> proposed ready mix concrete (RMC) mixing plant on a portion of the property located at 1404 <br /> Ramsey Road,Town of Albion,Dane County,Wisconsin ("the Site"). <br /> CONTACT INFORMATION <br /> SITE: <br /> Parcel 1 PIN-051206190013 Parcel 2 PIN-051206485035 <br /> Legal Description-SEC 6-5-12 SW1/4NE1/4 EXC CSM Legal Description-SEC 6-5-12 NW1/4SE1/4 EXC <br /> 7917 CSM 6248&CSM 7917&CSM 8708 (Activities <br /> Stoughton,WI 53589 limited to portion north of driveway easement) <br /> Stoughton,WI 53589 <br /> ENGINEER/AGENT: PROPERTY OWNER: <br /> Endpoint Solutions Corp. Jon Halverson <br /> 6871 South Lovers Lane Ramsey Pit,LLC <br /> Franklin,WI 53132 1404 Ramsey Road <br /> Contact:Marie Venne,P.E. Stoughton,WI 53589 <br /> Phone:414-858-2104 <br /> Email: Marie @Endpointcorporation.com <br /> READY MIX CONCRETE <br /> Ready mix concrete (RMC) is an essential building material for use in a variety of civil construction <br /> projects such as buildings, roads,bridges,dams,and variety of other structures. As the Wisconsin <br /> Department of Transportation WDOT and a variety of other municipalities continue efforts to <br /> update and expand the Interstate 39/90 corridors in Dane County and beyond,the demand for a <br /> locally available and economical option for the production and distribution of RMC is critically <br /> important to on-time and on-budget projects to reduce the costs to tax payers and impacts on <br /> commuters for these projects. <br />