Laserfiche WebLink
Endpoint Solutions <br /> Based upon the onsite availability of some ingredient aggregate materials as well as the proximity <br /> to the proposed construction work,the Ramsey Pit Site offers an ideal location for the staging of a <br /> portable,temporary RMC plant to be used on the 1-39/90 and supporting municipal projects. <br /> Ramsey Pit is requesting this Conditional Use Permit to operate a temporary RMC plant from <br /> January 1,2017 to December 31, 2022 for projects awarded on the I-39/90 expansion project. <br /> SITING <br /> The Site,consisting of Parcel 051206190013 and the portion of Parcel 051206485035 located <br /> north of the existing driveway that splits the parcel,currently operates as a quarry on an as needed <br /> basis. Ramsey Pit additionally owns four other neighboring parcels,but these parcels will not be <br /> involved in any RMC operations as a part of the Conditional Use Permit Application. <br /> The proposed RMC plant location was identified based upon the proximity to available material <br /> storage areas,accessibility to truck traffic,the presence of a barrier berm and recessed pit area <br /> from neighboring parcels,as well as to meet the proper setback requirements as identified in Dane <br /> County Zoning Regulations for the Site's A-1EX Exclusive Agricultural district zoning,which are <br /> discussed further in the following sections of this letter.No building or structure beyond the <br /> mechanical equipment is proposed as part of the application.The batch plant will be portable in <br /> order to be located adjacent to where aggregate production is occurring. <br /> The proposed area of operation for the portable plant,as well as the existing setback requirements, <br /> building footprints, driveways,parking areas,and material storage areas are included in Figure 1. <br /> The land use of neighboring parcels along with their zoning is included in Figure 2. <br /> OPERATION DESCRIPTION <br /> The proposed portable installation of a RMC Plant would be utilized to mix concrete and load trucks <br /> for distribution to I-39/90 corridor expansion municipal project jobsites.While the exact number of <br /> employees for the plant is currently unknown,similar plants staff between five (5) and fifteen (15) <br /> employees as part of a portable RMC plant operation team. Operational periods will include <br /> general daytime operating hours of approximately 6:00 AM until 8:00 PM during weekdays and <br /> intermittent operation during weekends as project demands arise. However,WDOT does require <br /> nighttime work to limit impacts to drivers and to improve worker and driver safety.As such,for <br /> some segments of the project this Conditional Use Permit application requests 24-hour operation to <br /> accommodate the I-39/90 construction schedule. <br /> Outdoor storage would consist of piles stored within the operative area identified in Figure 1, <br /> similar to current material staging activities. Cement materials would be stored in portable bins <br /> and handled so as to minimize any dust exposure. Activities conducted outdoors at the Site,in <br /> addition to the existing mining operations,would include the staging,handling,and mixing of <br /> materials,loading of delivery trucks,and washout of trucks into internally drained ponds. Waste <br /> generated from washing activities would be handled by removal offsite to an appropriate disposal <br /> facility. Domestic waste generation would be handled by an onsite dumpster that is regularly <br /> emptied by a local waste management service. <br /> Ramsey Pit,LLC-Conditional Use Permit October 19,2016 <br /> Endpoint Project:393-002-001 Page 2 of 5 <br />