Laserfiche WebLink
• <br /> EidpointSoludoi v-e_za e <br /> 6871 South Lovers Lane <br /> Franklin,WI 53132 <br /> Telephone: (414)427-12 <br /> Fax: (414)427-1259 <br /> www.endpointcorporation <br /> Mr. Dan Everson November 14, 2016 <br /> Zoning Division <br /> Room 116,City-County Building <br /> 210 Martin Luther King Jr.Blvd. <br /> Madison,WI 53703-3342 <br /> Subject: Parcel Rezoning Application <br /> Parcel#051227480200,Town of Albion,Wisconsin <br /> Dear Mr.Everson: <br /> Endpoint Solutions Corp.(Endpoint),on behalf of Mr.Jon Halverson(property owner),is <br /> submitting the enclosed application,drawing and supporting information for your review <br /> regarding the proposed zoning change for Mr.Halverson's property identified as Parcel <br /> #051227480200 on Haugen Road,Town of Albion,Dane County,Wisconsin("the Site"). <br /> CONTACT INFORMATION <br /> SITE: <br /> Parcel 1 PIN-051227480200 <br /> No physical address is provided <br /> Legal Description-SEC 27-5-12 NE1/4SE1/4 Lot 1 <br /> CSM 11188 C567/234-235 09-29-04 <br /> Stoughton,WI 53589 <br /> ENGINEER/AGENT: PROPERTY OWNER: <br /> Endpoint Solutions Corp. Jon Halverson <br /> 6871 South Lovers Lane 1400 Ramsey Road <br /> Franklin,WI 53132 Stoughton,WI 53589 <br /> Contact:Marie Venne,P.E. <br /> Phone:414-858-2104 <br /> Email:Marie @Endpointcorporation.com <br /> REZONING REQUEST <br /> At present,the Site is zoned C-2 Commercial District and is utilized as cropland. The parcel is 5.2 <br /> acres in size with approximately 365 feet of frontage on the north property line on Haugen Road. <br /> Mr.Halverson is requesting the subject parcel be rezoned to A-2(4)Agricultural District to allow for <br /> the proposed installation and operation of a temporary,portable ready mix concrete(RMC)batch <br /> plant. A conditional use permit(CUP)application has also been submitted under separate cover for <br /> the proposed RMC batch plant installation.Activities at the site will include receiving,staging,and <br /> handling of raw materials;mixing of ready mix concrete;truck loading;and truck cleanout. Onsite <br /> utilities will include the use of portable generators as well as construction and installation of an <br /> industrial water well in accordance with applicable local and state requirements. An appropriate <br />