Endpoint Solutlons <br /> driveway permit as well as required State or local stormwater permits will be applied for and <br /> obtained under separate cover pending approval of the parcel rezoning and conditional use <br /> application (separate cover). A figure identifying the Site,Site dimensions,adjacent roadway right <br /> of ways,and other pertinent Site information as required is included on Figure 1. <br /> Presently,neighboring parcels within 1/2 mile of the Site are identified as possessing a variety of <br /> land uses including C-1 and C-2 Commercial,LC-1 Limited Commercial,B-1 Business,RH-1 Rural <br /> Housing,Al Exclusive Agriculture, R-1 Residential,and A-2(8)Agricultural designations.A map <br /> outlining the neighboring land use of adjacent and nearby parcels can be found in Figure 2. <br /> Adjacent parcels to the west and south are currently undeveloped,but zoned commercial. Parcels <br /> to the north and east are also zoned commercial and utilized for semi-tractor and trailer parking <br /> and refueling and other commercial uses. The nearest residences are located over 175'and 210' <br /> from the northeast and southeast property corners,respectively. The proposed use is consistent <br /> with neighboring non-residential parcels,and potential impacts to neighboring residential parcels <br /> from increased traffic,noise,and light will be limited to the extent practical.The RMC batch plant <br /> will have similar truck traffic and operating times expected from a commercial area and consistent <br /> with the existing neighboring commercial operations.The parcel is of sufficient size(>5 acres)to <br /> allow sufficient setbacks from neighboring parcels and roadways to minimize impacts. <br /> PROPOSED USE <br /> The proposed temporary and portable installation of an RMC Batch Plant would be utilized to mix <br /> concrete and load concrete trucks to supply I-39/90 Corridor Expansion Project jobsites and <br /> related County and municipal projects required due to the corridor expansion.While the exact <br /> number of employees will depend on the size and timing of the job awarded,similar plants staff <br /> between 5 and 15 employees as part of a portable RMC plant operation team.Operational periods <br /> will include general daytime operating hours of approximately 6:00 AM until 8:00 PM during <br /> weekdays and intermittent operation during weekends as project demands arise. However, <br /> Wisconsin Department of Transportation (WDOT) does require nighttime work to limit impacts to <br /> drivers and to improve worker and driver safety during certain time in the project schedule. <br /> If operations occur at night,outdoor lighting will be provided by portable lighting for the purpose <br /> of employee visibility and safety.To mitigate impacts to adjacent properties and roadways,the <br /> lights will be directed away from property lines and roadways and shielded if necessary so as not to <br /> create a public nuisance.Typical generator operated lights produce sound levels in the 55-65 <br /> decibels (dB) range.For comparison,a typical vacuum cleaner produces sound levels ranging from <br /> 60'85 dBs. <br /> Outdoor storage would consist of piles stored within the operative area identified in Figure 1. <br /> Cement materials would be stored in portable bins and handled internal to the mixing vessels so as <br /> to eliminate as much dust exposure as is reasonably possible.Activities conducted outdoors at the <br /> Site would include the staging,handling,and mixing of materials,loading of concrete trucks,and <br /> washout of trucks into designated areas in accordance with applicable stormwater requirements. <br /> Waste generated from washing activities would be recycled or removed from the Site for disposal <br /> Rezoning Application-Mr.Jon Halverson November 14,2016 <br /> Endpoint Project:393-002-001 Page 2 of 3 <br />