Laserfiche WebLink
IT'PS Landscaping elements will be placed in key locations on the subject site,based <br /> on layout and highway perspective. The main location for landscaping will be <br /> at the southeast corner of the site,near the proposed storm water management <br /> facility. Other locations for landscaping will be at the driveway entry and gate <br /> entry areas. <br /> ROTH <br /> PROFESSIONAL SOLUTIONS D. STORM WATER MANAGEMENT. The storm water management plan will <br /> follow Dane County Ordinance and WDNR NR151 Code requirements. <br /> While we await soil infiltration testing results,this requires a variety of storm <br /> water management features. <br /> The site drains to the northwest and southeast corners of the property, where <br /> storm water management facilities will be designed to meet the code <br /> requirements. Water quality control and peak flow control will be the main <br /> features of the storm water facilities. To maximize these features, rooftop <br /> (608) 697-5857 water will be directly connected via gutters and underground pipes to the storm <br /> ~MAIL water management system. Surface water runoff from paved and gravel areas <br /> robert@rpsprofessionalsolutions.com will be collected and treated prior to release off the site. <br /> We respectfully request to submit full storm water and erosion control plans <br /> rpsprofessionalsolutions.com to the Town, County & WDNR upon conditional approval of the rezoning <br /> request. <br /> N8678 CTH F Portage, WI E. SIGN. Wall mounted signs are proposed on the tower structures,as shown by <br /> example below(left picture). Each sign will be lighted with identification for <br /> Storage World. A ground sign is proposed as an identification sign at the <br /> driveway intersection of Field View Lane, also as shown by the following <br /> example(right picture). All signs will follow the Town and County processes <br /> for sign permitting and approval, subsequent to rezoning approval. <br /> ENGINEERING „mK <br /> CONSULTING <br /> DESIGN F. SCHEDULE. The anticipated project schedule is as follows: <br /> June-July 2016 Rezoning and Conditional Site Approval <br /> July-August 2016 SWMP&EC Approval <br /> August 2016 State and Building Permitting <br /> September 2016 Break-ground on New Facility <br /> FACILITATION Respectfully Submitted, <br /> Robert J. Roth, PE <br /> Project Engineer <br /> Page 4 of 4 <br />