Laserfiche WebLink
RPS 4. SURFACE. The site will be improved with an all-weather concrete surface <br /> as shown on Sheet B of the Phase I Site Plan, and as shown below as an <br /> example. The remaining areas will be graded and either graveled or <br /> restored to a turf condition. <br /> ROTH <br /> PROFESSIONAL SOLUTIONS <br /> (608)697-5857 5. TEMPORARY OPEN STORAGE. A portion of the site will be graded and <br /> graveled, and would facilitate an open storage site temporarily until all <br /> buildings in the Phasing Plan are built. This area would be screened from <br /> robert@rpsprofessionalsolutions.com view via the buildings built along the highway frontage as well as <br /> landscaping plantings along the southeastern sideslope. <br /> rpsprofessionalsolutions.com 6. LIGHTING. The proposed site will include exterior lighting as typical with <br /> self-storage operations for safety,accessibility and visibility. The lighting <br /> N8678 CTH F Portage,WI will be building wall mounted and directed downward in all cases. A <br /> detailed lighting plan will be made available as a condition of zoning <br /> approval. An example of the type of lighting that is proposed is shown <br /> below: <br /> ENGINEERING <br /> .t. CM E a. S1►+ .1 • <br /> ± <br /> CONSULTING .,, . <br /> DESIGN <br /> FACILITATION 7. WELL& SEPTIC. The site development will include basic provisions for <br /> an on-site office, which includes potable water and restroom facilities. <br /> The location of the septic field is shown on the site plan but ultimately will <br /> depend on final perc testing. <br /> C. AESTHETICS,LANDSCAPING. The building towers with decorative building <br /> elements are proposed as described above. This will break-up the mass <br /> building effect for the visual along the highway frontage. <br /> Page 3 of 4 <br /> 1' <br />