Laserfiche WebLink
FIRE ALARM SYTEM <br /> The building has a partial fire alarm system. An Edwards Intelligent Fire Alarm Panel is located <br /> in the former "Lieutenant on Duty" office. There are no pull stations. System type smoke <br /> detectors are located in certain areas and are wired to the Edwards panel. There are also self- <br /> contained standalone detectors in certain areas. <br /> EXTERIOR LIGHTING <br /> There are HID wall packs at most exterior doors and at intervals around the building. These are <br /> photo controlled. <br /> OTHER SYSTEMS <br /> At the main entrance to the office there is a GE Security control panel which may still be in use. <br /> There are ceiling speakers in many areas which were connected to the fire department dispatch <br /> radio system, now removed. <br /> There is telephone and network cabling in the building. Cabling originates in a cabinet in the <br /> northwest corner of the garage. Network cabling was noted in most offices. <br /> Surveillance cameras are located around the exterior of the building. No head end equipment, <br /> monitors or recording equipment for the cameras were noted in the walk through. <br /> COMMENTS <br /> The electrical system is in good condition. The service size is adequate to support the <br /> proposed project. Most of the light fixtures are appropriate for reuse. Energy savings could be <br /> obtained by replacing them with LED fixtures. <br /> ELECTRICAL COST TO REMODEL <br /> Based on the preliminary floor plan, these are the estimated costs: <br /> Lighting: relight stack areas, play literacy, storage/open work areas, and new toilet rooms <br /> $28,000 <br /> Power: add receptacles, connect new HVAC units and replace panel demolished in office area <br /> $15,000 <br /> Telecom: establish new IT rack. Add telecom outlets and rewire existing office outlets to new IT <br /> rack. <br /> $9,000 <br /> Sincerely, <br /> ALa in, M. Cza rv4eciz% <br /> Alan M. Czarnecki, P.E. <br />