|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00683
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 2:18:57 PM
Creation date
2/8/2017 2:12:45 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00683
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 1 <br /> Alan Theobald <br /> From: Lane, Roger[lane.roger @co.dane.wi.us] <br /> Sent: Thursday, August 28, 2008 1:10 PM <br /> To: Deb Hatfield <br /> Cc: Alan Theobald; Judy Faust; Hans P. Justeson; Matt Collins; Balousek, Jeremy; Schutte, Kristine <br /> Subject: RE: Novation Campus - Lot 12 <br /> Thanks for the info. Makes sense. <br /> Roger <br /> Original Message <br /> From: Deb Hatfield [mailto:deb.hatfield @jsdinc.com] <br /> Sent: Thursday, August 28, 2008 12:18 PM <br /> To: Lane, Roger <br /> Cc: Alan.Theobald @planningdesignbuild.com; Judy.Faust @planningdesignbuild.com; Hans P. Justeson; Matt <br /> Collins; Balousek, Jeremy <br /> Subject: Novation Campus - Lot 12 <br /> Roger, <br /> I am responding to your question to Planning Design Build regarding the site plan not having a detention area on <br /> site No detention/sediment/infiltration area is needed on the site because the detention and sediment <br /> requirements are met by the regional basin (expanded Lake George) and the area is excluded from infiltration <br /> because of the high risk of contamination. However, Oil and Grease Control is required for the site. This <br /> requirement will be met by the use of Catch-All HRI filters installed in the on-site inlets. We discussed the <br /> stormwater requirements for the site with Jeremy Balousek and a Stormwater Management Plan which includes <br /> both Phase 1 of the plat and Lot 12 has been submitted to him. If you have any other questions regarding the <br /> stormwater management plan for the site, please let me know. <br /> Deborah J. Hatfield, P.E. <br /> )SD Professional Services,Inc. <br /> • Engineers • Surveyors • Planners <br /> Madison Regional Office <br /> 161 Horizon Drive,Suite 101 <br /> Verona,WI 53593 <br /> 608.848.5060 phone <br /> 608.848.2255 fax <br /> deb.hatfield @jsdinc.com;www.jsdinc.com <br /> 9/4/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.