|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-00397
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-00397
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 11:55:02 AM
Creation date
2/9/2017 11:51:46 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
00397
Town
Middleton Township
Section Numbers
27
AccelaLink
DCPCUP-0000-00397
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. William Fleck <br /> Page Two <br /> June 5, 1984 <br /> Temporary Tower Candelabra Tower <br /> Elevation of site <br /> above mean sea level 1,140 ft. 1,127 ft. <br /> Height of tower 1,109 ft. 1,422 ft. <br /> Overall height <br /> above mean seal level 2,249 ft. 2,549 ft. <br /> In addition to the proposed towers, a transmitter facility will be <br /> constructed. This facility will be a single story, multiple module <br /> structure, that will house the transmitters and related equipment. <br /> Each module will be approximately 30 ft by 40 ft in size. <br /> A proposed private driveway, off of County Trunk Highway S, will serve <br /> as ingress and egress to the tower site. Once construction of the tower <br /> is completed, it is anticipated that the volume of traffic utilizing the <br /> private driveway will be no more than one or two cars per day. An <br /> application and permit for access to County Trunk Highway S (Mineral <br /> Point Road) has been submitted to the Dane County Highway Department. <br /> Projected construction on the temporary tower is scheduled to start <br /> in October,, 1984 with completion occurring in May, 1985. The projected <br /> construction of the candelabra tower is scheduled to start in March, <br /> 1986 with completion scheduled in August, 1986. <br /> Completion of the project will require certain approvals from a number <br /> of governmental agencies, including the Federal Aviation Administration, <br /> the Federal Communications Commission, and the Wisconsin Department of <br /> Transportation. Applications for the appropriate approvals have been <br /> submitted and are pending. <br /> The land elevation of the site is very suitable for this type of tower <br /> construction in that it provides additional transmitting propagation <br /> for all of the UHF channels. The site is also located in a nonresidential <br /> area. All contiguous land uses within 300 feet of the proposed tower <br /> are zoned County A-1, and it appears are presently used for farming <br /> purposes. <br /> Also enclosed are a legal description of the land for which the permit <br /> is requested, tax parcel number, filing fee of $60.00 and a site plan <br /> of the property. A letter from WHA's director of engineering regarding <br /> the structural soundness of the tower will be forthcoming. <br />
The URL can be used to link to this page
Your browser does not support the video tag.