Laserfiche WebLink
FW: Revised Erosion Control Plan - Lynch Residence Page 2 of 2 <br /> Forwarded Message <br /> From: Ryan Barz<Ryanb @pobinc.com> <br /> Date: Fri,29 Aug 2008 11:02:41 -0500 <br /> To: <andy @ginkgohouse.com> <br /> Cc: Ryan Barz<Ryanb @pobinc.com> <br /> Conversation: Revised Erosion Control Plan-Lynch Residence <br /> Subject: Revised Erosion Control Plan-Lynch Residence <br /> Andy, <br /> Attached is a revision to the erosion control plan. We have added proposed elevations to illustrate a swale on <br /> the Lynch property to keep runoff from leaving the site. Let me know if you have any questions. <br /> Ryan Barz, P.E. <br /> Project Engineer <br /> Point of Beginning, Inc. <br /> 5709 Windy Drive, Suite D <br /> Stevens Point, WI 54481 <br /> Office: (715)344-9999 <br /> Fax: (715)344-9922 <br /> End of Forwarded Message <br /> 9/3/2008 <br />