Laserfiche WebLink
Ralph T. Gannett <br /> Page 2 <br /> - The original recommendation to the local board from their <br /> Land Use Committee, after true analysis was against the <br /> rezoning to c2 and stated community incompatibility <br /> and potential hazzards among the reasons. <br /> - Interview with several near current neighbors of the business <br /> indicate running a large horsepower sandblast operation <br /> at odd hours with tremendous noise consequences. This was <br /> brought out at the town board meeting along with the in- <br /> tent of the operator to continue doing the blasting out <br /> doors. <br /> - The business is incompatible with long term growth of the <br /> surrounding area which should support homes, multi family <br /> dwellings and potentially small businesses. Light commercial <br /> opportunities could well exist in the section between the <br /> road and tracks without creating the traffic hazzards that <br /> the proposed truck shop does. <br /> I do hope that these points and the concern for our community <br /> potential will prevail. I am for orderly growth and do infact <br /> want to see business in the area, however growth should be <br /> guided along lines of compatibility and strong future <br /> planning for interactive structuring of residences and job <br /> opportunities without stressing the ability of the services <br /> needed to support growth in the area. <br /> Sincerely, 5 s', <br /> rt <br /> Ralph T. Gannett <br />