|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2008-00553
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2000s
>
2008
>
DCPZP-2008-00553
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 2:00:13 PM
Creation date
2/28/2017 3:01:15 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2008-00553
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. All disturbed slopes steeper than 20%must be erosion matted during final site <br /> stabilization. The erosion matting must be WisDOT Class II, Type B matting or better, <br /> as specified in the plan. <br /> 8. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur in the areas identified as "undisturbed"or"vegetated buffer" <br /> on the plan. In the event any of these areas are disturbed, additional erosion control <br /> measures will be required. <br /> 9. The maintenance agreement for permanent stormwater management practices must be <br /> recorded with the Register of Deeds and a letter of credit(LOC) for 110%of the <br /> expected cost of erosion control and stormwater management($30,905)must be <br /> submitted prior to permit issuance. <br /> 10.As-built plans and certification, performed by a professional engineer, will be required <br /> for all permanent stormwater management practices and facilities. <br /> 11. The plan includes a construction schedule as follows: <br /> Grading and construction is planned to begin upon permit issuance. <br /> All disturbed areas on the site must be permanently seeded and mulched(or <br /> erosion matted where noted) by October 15, 2008. <br /> The construction site must follow the plan according to the schedule approved by Dane County <br /> Land Conservation. This permit will expire on the stabilization date included in the plan <br /> (October 15,2008) and may be amended prior to permit expiration only. This review is for <br /> the erosion control and stormwater management requirements of Chapter 11 and 14, Dane <br /> County Code of Ordinances only and other approvals may be necessary. The applicant must <br /> obtain a permit card from the Land Conservation counter and display it on the site prior to <br /> disturbing ground. It is recommended that you contact the Land Conservation Division prior to <br /> picking up the permit card. <br /> Cc: Dan Schneider, JSD Professional Services, Inc. (by email) <br /> Hans Justeson, P.E., JSD Professional Services, Inc. (by email) <br /> Dave Uttech, Keller, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.