|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02371
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 12:01:56 PM
Creation date
5/9/2017 11:57:57 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02371
Town
Blue Mounds Township
Section Numbers
14
AccelaLink
DCPCUP-2017-02371
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fink's Paving&Excavating,Inc. cont. <br /> Length of Permit: 25 Years beginning April 2017 and ending April 2042. <br /> Erosion Control: Please refer to the attached Erosion Control Plan <br /> Rock Blasting: All blasting is hired out to Yahara Materials.Drilling,blasting and crushing occurs <br /> approx.3 times a year.Drilling and Blasting will not occur below or near the <br /> existing water table. <br /> Dust Control: Spray bars will be used on crushing equipment as necessary to control dust as the <br /> material is processed.Water will be sprayed on haul roads to control dust from <br /> trucking operations. <br /> Haul Routes: The access driveway to the site enters and exits on to Hwy 78 next to the on and off <br /> ramps from Hwy 18/151 and Hwy 78 South <br /> Safety Fence <br /> And Signage: The Quarry is surrounded by fencing leading up to the main entrance road with NO <br /> TRESSPASSING signs at regular intervals <br /> Restoration Plan:As phases of the site are depleted,restoration could begin as site conditions <br /> warrant.Any restoration would start on the Western portion of the quarry <br /> Conclusion: Legitimate concerns regarding the approval of quarry operations center around the <br /> issues of the environment and the health and safety of the surrounding area.As <br /> managers of this quarry,Fink's Paving&Excavating,Inc conduct our operations <br /> standard operations procedures for this industry with the concerns of our neighbors <br /> regarding blasting,noise and dust. Our well-conceived operation and reclamation <br /> plans will assure protection for the environment and surrounding area. <br /> Respectfully Submitted, <br /> • <br /> dr <br /> Fink's Paving&Ex..eating,Inc <br /> David Bing <br /> President <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.