|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02373
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 1:35:09 PM
Creation date
5/9/2017 1:04:19 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02373
Town
Albion Township
Section Numbers
35
AccelaLink
DCPCUP-2017-02373
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOFFMAN CONSTRUCTION CO. <br /> HOFFM AN <br /> CON"TRUCTpN <br /> 123 CTH A <br /> Black River Falls,WI 54615 <br /> Phone(715)284-2512 Fax(715)284-9698 <br /> www.hoffmanconstructionco.com <br /> • Type and quantities of materials needed: approximately 12,000 cy of <br /> concrete batch per NB & SB mile of 1-39 is required and washed sand and <br /> stone for temporary asphalt roadways, cross overs and shoulders. <br /> Approximately 600,000 cy of washed sands & gravels will be mined on <br /> site, with up to an additional 400,000 cy of pit run material hauled to the <br /> site for processing from the grandfathered Eastman location (487 Hillside <br /> Road) <br /> • Proposed dates to begin extraction, end extraction & complete <br /> reclamation (based on proposed Wis DOT construction schedule —actual <br /> schedule may vary): <br /> O Phase I -- Site prep plant sites & stockpiles (46 acres) —April 2017 <br /> O Mining phase 11 (15 acres)April-June 2017 <br /> O Reclaim phase 11 mining — June 2017 <br /> O Mining phase III (15 acres) June 2017-Aug 2017 <br /> O Reclaim phase III mining —Aug 2017 <br /> O Mining phase IV (15 acres) Aug 2017-Oct 2017 <br /> O Reclaim phase IV (15 acres) Oct 2017 <br /> O Crushing, washing sand & gravel —April 2017-Oct 2017 for NB I- <br /> 39, Dane County Line to E. Church Rd project; March 2018-Oct <br /> 2018 or SB 1-39, Dane County Line to E. Church Rd project; <br /> Additional dates as needed for future WisDOT contract lets <br /> O Concrete & asphalt batch — May 2017-Nov 2017; April 2018-Nov <br /> 2018 <br /> O Import pit run Eastman Hillside grandfathered site Jan-March 2018 <br /> O Complete concrete & asphalt batching Nov 2019 <br /> O Restore haul roads, perimeter berms & plant site November 2025 <br /> or earlier as WisDOT lets contracts. <br /> • Hours of Operation (based on Wis DOT construction schedule <br /> requirements): <br /> O Mining — 6:OOam-6:OOpm Mon-Friday, occasional Saturday <br /> O Crushing & washing — 24/5 Monday-Friday, occasional Saturday <br /> O Concrete & asphalt batching — Day and/or night as required to meet <br /> WisDOT contract requirements Mon-Sat, occasional Sunday <br /> • Geologic composition & depth to mineral: <br /> O 9"-12" topsoil <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.