|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02373
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 1:35:09 PM
Creation date
5/9/2017 1:04:19 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02373
Town
Albion Township
Section Numbers
35
AccelaLink
DCPCUP-2017-02373
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOFFMAN CONSTRUCTION CO. <br /> IIMINAmumm HOFFMAN <br /> - CONSTRUCTION <br /> ■•■1 4111111111 <br /> 123 CTH A <br /> Black River Falls,WI 54615 <br /> Phone(715)284-2512 Fax(715)284-9698 <br /> www.hoffinanconstructionco.com <br /> O 24"-36" silty/clay B horizon soil <br /> O 4'-12' sand & gravel vein (to be mined & stockpiled) <br /> O 12'+ fine clean sand <br /> • Haul routes and traffic flow: <br /> O For NB 1-39 (Dane County line to north of Church Road), ROW <br /> fence access directly from property <br /> O For SB 1-39 (Dane County line to north of Church Road), Lake <br /> Drive underpass to 1-39 SB ROW fence <br /> O For 1-39 north of Church Road — Lake Drive west to Hwy 73 north to <br /> 1-39 interchange <br /> O For cement import & asphalt millings (as needed) — 1-39 <br /> interchange to Hwy 73 south to Lake Drive east to Eastman Radio <br /> Tower location <br /> O For pit run from Eastman Hillside Drive: Hillside Drive south to <br /> Radio Tower haul road (from east) <br /> • Phasing plan: <br /> O Phase I — Operation site area preparation — erosion control, <br /> stormwater management, haul road construction, plant & stockpile <br /> laydown areas, sediment ponds & perimeter berms including <br /> restoration. Approximately 46 acres. <br /> O Phase II mining — 1-39 east to fence line <br /> O Phase III mining fence line east to Hillside Drive <br /> O Phase IV mining Hillside Drive west to sediment ponds <br /> O Phase V— Import pit run from Hillside Grandfathered Site <br /> • Equipment use: <br /> O Mining — backhoes & 40 ton articulated trucks, dozers, scrapers <br /> O Crushing —wheel loader, crushing plant, cone crusher, screen <br /> plant, conveyors & stackers <br /> O Washing —wheel loader, wash plant, pumps & piping, conveyors & <br /> stackers <br /> O Concrete & asphalt batch — batch plants, wheel loaders, bins & <br /> conveyors, quad axle dump trucks, tractor trailer combinations <br /> (cement import) <br /> O Quad axle dump truck import of pit run from Eastman <br /> grandfathered site <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.