|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02373
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 1:35:09 PM
Creation date
5/9/2017 1:04:19 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02373
Town
Albion Township
Section Numbers
35
AccelaLink
DCPCUP-2017-02373
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOFFMAN CONSTRUCTION CO. <br /> • ��„ Ho�rn�uv <br /> _ CONSTRUCTION <br /> 123 CTH A <br /> Black River Falls,WI 54615 <br /> Phone(715)284-2512 Fax(715)284-9698 <br /> www.hoffmanconstructionco.com <br /> • Site use: <br /> O Crushing, washing, screening, convey & stack, asphalt & concrete <br /> batching, import of pit run from Eastman grandfathered site Hillside <br /> O No fuel storage, unit fill fuel delivery <br /> O Liquid asphalt delivery and temporary storage <br /> • Excavation & groundwater: <br /> O Freshwater wash pond (groundwater) will be excavated and used <br /> as source of wash water. Two sediment ponds will be used to <br /> receive wash water from wash plant prior to discharge and recycle <br /> freshwater wash pond water for re-use (closed loop). The <br /> freshwater/sediment ponds and stormwater management basins <br /> are planned to remain and will be incorporated into the site <br /> reclamation plan as wildlife ponds. <br /> • Temporary or permanent structures: <br /> O No permanent structures to remain. Temporary structures include <br /> the job trailer, scale, access control gates, signage, asphalt & <br /> concrete batch plants and washing/screening/crushing/conveying <br /> equipment will be removed at the conclusion of the project. Site <br /> improvements that may be removed will be coordinated with the <br /> land owner and may include temporary pavement and portions of <br /> the access drives and perimeter screening berm. <br /> • Erosion control measures <br /> O Wis DOT &Wis DNR selected site storm water plan (TRANS 401) <br /> to be designed, approved and implemented including tracking pads, <br /> perimeter& screening berms, silt fence, sediment ponds, <br /> emergency overflow. Water and/or calcium chloride to be used for <br /> dust control. Fuel spill kits to be present on site. Mechanical <br /> broom available for sediment control on roadways. <br /> • Proposed reclamation use: <br /> O Land will reclaimed to support agricultural cultivation and/or re- <br /> vegetation of upland areas and water management features to <br /> maintain and enhance wildlife habitat within the CUP area. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.