|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2017-02381
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2017
>
DCPCUP-2017-02381
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2017 1:57:09 PM
Creation date
7/11/2017 1:51:09 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02381
Town
Pleasant Springs Township
Section Numbers
9
AccelaLink
DCPCUP-2017-02381
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Subcontractor acknowledges that Hoffman Construction Company has the right to request additional drug& <br /> alcohol program verification at any time,and that failure to provide the requested information in a timely <br /> manner may be grounds for termination of our relationship. <br /> Manufacturer's Certification of Compliance Filing Process document is an agreement between Hoffman <br /> Construction Company and the Subcontractor to modify Section 106.3,paragraph 4:"Samples and Tests"of <br /> the 1989 State of Wisconsin Standard Specifications: Reference Current Supplemental Specifications. <br /> In the case of manufactured products or assemblies, the engineer may at their discretion, accept the <br /> manufacturer's Certified Report of Test or Analysis or a Manufacturer's Certificate of Compliance in lieu of <br /> performing tests on samples, The kind of document required will be as directed by the engineer. <br /> The manufacturer's certifications shall be provided by the Subcontractor within 7 calendar days when <br /> requested by the Wisconsin Department of Transportation or by Hoffman Construction Company, The ability <br /> to provide the certifications shall be maintained for a period of five(5)years after contract work is completed. <br /> Samples of the certified products or assemblies may be taken by the Wisconsin Department of Transportation <br /> for certification verification testing. If the certifications cannot be provided as required above or do not meet <br /> contract requirements,or the certification verification test results indicate the products or assemblies do not <br /> meet the contract requirements,the products or assemblies shall be considered unacceptable materials and <br /> will be handled in accordance with Section 106.5 of the State of Wisconsin Standard Specifications for Road <br /> and Bridge Construction. <br /> The undersigned Subcontractor agrees to retain copies of certifications of compliance for a five (5) year <br /> period and when requested, will provide the Wisconsin Department of Transportation a copy of the <br /> certification within seven(7)calendar days. <br /> Contractor: / Subcontractor: T'f//l/f/1/`t <br /> Hoffman $ • ion Company <br /> By: ' .■.c__ <br /> Title: 4'94'7 Q Title: (2 EL <br /> Date: eV/4.r''/-t.a> Date: "7/9Cii17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.