Laserfiche WebLink
Public Hearing: June 27, 2017 Petition: CUP UP 2381�t <br /> ° �' Staff Report Zoning Amendment: Town/sect: <br /> '„‘4' <br /> None Pleasant Springs <br /> Section 9 <br /> Acres: .87 Applicant <br /> Zoning and Land Regulation Committee Survey Req. No Joel E Hougen <br /> Reason: <br /> Ready mix concrete batch plant Location: <br /> 500 feet east of 2488 <br /> Koshkonong Rd <br /> tii j -- <br /> T 1 a <br /> p <br /> A-1(I N) C-2 I■ C, A-2 R-1Q <br /> if <br /> a 3 0 --- <br /> - <br /> ' . _._ it <br /> ...% A-1(IX) <br /> a <br /> rn <br /> A-41X) To: CUP <br /> C <br /> i <br /> i <br /> CUP <br /> 'C-I 52 I I <br /> Taverns <br /> SI.- Koshl� non.g_Rd <br /> _ A-1(EN <br /> � i <br /> '—LC-1_ 4 <br /> \ t A 2 .<> -2(2)ro_ A-1(EX) <br /> A-1(f X) — <br /> DESCRIPTION: The applicant is requesting a conditional use permit (CUP) for a temporary ready mix concrete plant <br /> within an existing non conforming (NC) mineral extraction site. Trierweiler Construction is the agent. The material will <br /> be used for a WisDOT project at the 1 39/90 & CTH N interchange, located north of the site. <br /> OBSERVATIONS: There is a water feature on the northeastern corner of this site, and the property has had high water <br /> levels this spring. Recent site inspections revealed that the water level has decreased (please see following photos). <br /> Because of the water on site, it is important that we have a detailed operations plan for the batch plant area showing <br /> where all the equipment will be located; where vehicles are parked; and where any chemicals or fuel will be stored on <br /> the property The original application only includes an overall site plan showing the location of the CUP area within the <br /> overall NC mineral extraction site. Staff contacted the applicant and he agrees to provide this site plan and is in the <br /> process of provided it to staff. <br /> TOWN PLAN: Please see following detailed staff report <br /> RESOURCE PROTECTION: <br /> STAFF: Please see the following detailed staff report. <br /> TOWN: The Town of Pleasant Springs approved this petition with 2 conditions: Duration of permit to be June 2017 to <br /> December 31, 2019, and that Dane County review conditions and provide additional restrictions as seen necessary.. <br />