|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00412
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2017 2:35:18 PM
Creation date
7/13/2017 4:12:14 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2017-00412
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Driveway Approval <br /> Request Type: Proposed driveway to be in Town of Vermont Section: 36 <br /> Q New Construction Driveway would enter Town/Cty Road or State Hwy: no � <br /> J <br /> Improvement <br /> Proposed driveway length in feet: 900 <br /> © Permit Reinstatement <br /> Would driveway pass through property owned by <br /> someone other than applicant? Cl© <br /> Is driveway a shared driveway? no <br /> Contractor Information <br /> Contractor: Contractor Address: Contractor Phone#: <br /> A.L. Landscaping 6602 Grand Teton Plaza, Suite 100A 608-628-3179 <br /> City: Zip Code: Contractor Email: <br /> Madison 53719 chucklandscapingagmail.corn <br /> Driveway Permitting Notes: <br /> A driveway construction permit is required for any work that includes excavation or filling that changes the existing grade at <br /> any location by three feet or more,or that disturbs more than 4,000 square feet of land area,or that enters a public road <br /> • A driveway improvement permit is required for any work that changes the existing grade by less than three feet at any <br /> location,and that disturbs less than 4,000 square feet of land area. <br /> • If over 20,000 square feet of new,impervious area is added,a Dane County storm water management/erosion control plan w II <br /> also be required in conjunction with the driveway improvement application. <br /> • Driveway must be completed and receive final inspection within three(3)years of board approval date or either a permit <br /> reinstatement or a new permit will be required <br /> • Applicant must submit a driveway construction plan&erosion control plan with an application for new driveway construction. <br /> An engineer plan may also be required. <br /> �- The driveway construction plan must include at a minimum: <br /> • Location of existing and proposed driveway(s),with dimensions to property boundaries <br /> • GPS coordinates on the centerline(1)where it enters the public road,(2)every 50 feet(3)where it terminates <br /> • Location of any stream,wetland or other surface water within 1,000 feet of land to be disturbed <br /> :r. Refer to process flow document at townofvermont.com <br /> Conditional Use Permit (CUP) <br /> Descl-the Purpo e <br /> Current parcel(s)number(s): <br /> Number of acres the proposed conditional use permit <br /> ( f <br /> would apply to: <br /> Total number of acres in the parcel of which this acreage <br /> a part: <br /> Parcel is currently zoned: <br />
The URL can be used to link to this page
Your browser does not support the video tag.