Laserfiche WebLink
Again,thank you for your assistance and cooperation. I look forward to working with you to complete this process and <br /> obtain the final permits. <br /> Thank you, <br /> Marc Bourgault <br /> From: Marc Bourgault <br /> Sent:Thursday,June 29, 2017 12:00 PM <br /> To:Scott Schroeckenthaler(schroeckenthaler @countyofdane.com) <schroeckenthaler @countyofdane.com> <br /> Cc:John Carabelli (JCarabelli @RoadRangerUSA.com)<JCarabelli@RoadRangerUSA.com>; Hope Collins <br /> <hcollins @roadrangerusa.com> <br /> Subject: Road Ranger#136 on County Hwy N <br /> Importance: High <br /> Scott, <br /> Thank you for taking the time to reach out to us. I apologize for any confusion or problems that I may have caused. Per <br /> our discussion, please reference the attached files and the notes below. <br /> 1. Sheet S1 shows the canopy signage. We replaced the two Road Ranger badges with two letter cabinets and <br /> two horse heads. Also, we removed the red building awnings and plan on installing two blue awnings over the <br /> front doors. We added red LED band lighting to the auto canopy as well. <br /> 2. Sheet S2 shows the before and after images of the four sides of the building. I believe that you stated the <br /> painting work, building awnings, flashing and stone work are not an issue. I plan on continuing with the <br /> completion of that work unless you tell me differently. We did remove the two illuminated "Road Ranger" <br /> letters on the north and west sides. We added the two letter cabinets instead. Also, we added the horse mural <br /> on the west side. The window graphics will probably be updated. I don't have details on the window graphics <br /> yet. <br /> 3. We are adding 10 dual faced directional signs on our property. The locations of them can be found on sheets <br /> C19 and C20 of the site plans. The graphics and other details can be found on sheet C23 of the site plans. I am <br /> including other reference site plan sheets for your use. <br /> 4. At this point we do not have any plans on adding any cabinets or additional signs to the high rise pylon sign or <br /> mid-rise dual post sign on our property. We may have to replace the Subway faces depending upon Subways <br /> requirements based on our franchise agreement. Subway has changed/updated their image and may require us <br /> to update those faces. In addition,they may require the building sign (north face)to be replaced. Once I have <br /> info on that, I will contact your office before anything is done. <br /> 5. I am including pictures which I took yesterday(6/28/2017) at the site for your reference. <br /> 6. We plan on adding site lighting to our site due to some of the effects of WisDOT's access re-configuration. <br /> I understand that you issued a stop work order for the installation of the signs on the property until we have the proper <br /> permits. It is my understanding that this does not affect the painting, stonework, landscaping, building awnings, <br /> sitework,or other work at the site which is not signage. <br /> Please contact me at your convenience once you have reviewed the attached material. I would like to discuss any issues <br /> or concerns. <br /> Please confirm that you received this email and the attachments. <br /> Thank you, <br /> Marc Bourgault, P.E. <br /> Vice President of Engineering, Planning& Development <br /> Cell:815-540-9929 <br /> Fax: 815-308-7066 <br /> MBourgauit@RoadRangerUSA.com <br /> Road Ranger, L.L.C. • <br /> 4930 East State St., Rockford,IL 61108 <br /> 'We.7fe(p Peop(e" <br /> 2 <br />