|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2017-00643
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPZP-2017-00643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2017 2:22:30 PM
Creation date
10/3/2017 1:31:53 PM
Metadata
Fields
Template:
Zoning Permits
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
September 25, 2017 <br /> DANE Mr. Scott Schroeckenthaler <br /> c Q U PJ T v Zoning Inspector <br /> Itt,IONAL RT Dane County Zoning Division <br /> AIRF;; <br /> MADISON 210 Martin Luther King Jr. Blvd. <br /> Department of Planning and Development <br /> Room 116, City-County Building <br /> Madison, WI 53703-3342 <br /> Re: Permit Application under§78.06 Dane County Ordinance <br /> Crane Mobile <br /> N43-07-50.50 W89-17-21.20 <br /> Dear Mr. Schroeckenthaler: <br /> Below are the conditions the Airport requests the Zoning Administrator establish <br /> for issuance of the permit. <br /> CONDITIONS APPLICABLE TO CRANE MOBILE PERMIT: <br /> (1) Applicant shall comply with all conditions and recommendations set forth in <br /> the Determination Letter regarding Federal Aviation Administration Aeronautical <br /> Study No. 2017-AGL-13585-OE. <br /> (2) Prior to erecting the construction crane, applicant shall provide the on duty <br /> Airport Operations Supervisor, Dane County Regional Airport (cell: 608-235-1001 <br /> or office: 608.246.3397), with the name and telephone number of an individual(s) <br /> having authority over operation and placement of the crane while it is on the <br /> construction site and, upon request, shall arrange a meeting between Airport <br /> staff and the contractor that will be operating the crane. <br /> (3) Applicant shall, at least three days before the crane height will reach 1,147 <br /> feet MSL, provide notice to Airport Operations. <br /> (4) At all times the highest point of the crane shall be marked during daylight <br /> hours with an orange and white checkered construction flag measuring at least <br /> three feet by three feet, and with a red obstruction light, with a minimum intensity <br /> of 32.5 candela, from two hours before sunset until two hours after sunrise and <br /> during periods of reduced visibility. <br /> (5) Neither the construction crane nor any equipment or other items attached to, <br /> or used to erect the crane, except the above described flag and light, shall at any <br /> time exceed a height of 1,147 feet MSL. <br /> 4000 International Lane ( Madison, WI 53704 i (608) 246 - 3380 nlsnairport.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.