Laserfiche WebLink
1 <br /> DANE COUNTY Zoning Division <br /> .'' lr. PLANNING DEVELOPMENT Room 116, City-County Building <br /> 210 Martin Luther King Jr. Blvd. <br /> Madison, Wisconsin 53703-3342 <br /> Phone: (808) 2664266 Flood lain Development Application <br /> Fax: (808) 267-1540 <br /> Items required to be submitted with application: <br /> o Site Development Plans <br /> Plans shall include scaled drawings of existing topography of the area and proposed final grades of <br /> development. All topographical information shall be in NAVD 1988 and be referenced to a known <br /> benchmark. The plan shall show all existing and proposed building footprints and elevations of lowest <br /> floor elevations. The plans shall include dimensions of ditches,culverts,or other structures existing or <br /> proposed. All plans shall be stamped and signed by a professional engineer or architect. <br /> o Engineering Analysis <br /> The analysis shall include calculations or modeling that shows that the development will not obstruct <br /> flow or will not increase the floodwater elevation 0.01 of a foot or more.All calculations shall be <br /> stamped and signed by a professional engineer or architect. <br /> Owners NameALliant Energy - Dana Halverson Contractor's Name Eilertson Inc. - Ted Pittz <br /> Address 4902 N Biltmore Street, Address PO Box 1025, <br /> Madison WI 53718 Fond du Lac WI 54936-1025 <br /> Phone Phone <br /> (608) 458-3495 (920) 921-8982 <br /> Email danahalverson @alliantenergy.com Email <br /> Parcel numbers affected: road ROW, no parcels on Town: Verona Section:14 <br /> project route identified via Dane County Within Road ROW along <br /> Property Address: <br /> DCI Map Old CTH PB <br /> FEMA Panel Map:55025C0557G Floodplain District:Dane County Flood Elevation: 954 -21 ' * <br /> *flood elevation of nearest mapped cross-section (XS C in model) <br /> Scope of work: (Describe development in detail) Alliant Energy is planning to relocate <br /> approximately 200 lineal feet of underground electric line along Old CTH PB <br /> to accommodate a bridge replacement project. Electric line will be installed <br /> via horizontal directional drilling (HDD) . Bore pit excavations in mapped <br /> floodplain will be restored to existing grades and vegetative cover. <br /> I authorize that I am t r or have permission to act on behalf of the owner of the property. 12/14/2 017 <br /> Submitted By: Date: <br />