|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPFLO-2017-00015
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2017
>
DCPFLO-2017-00015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2017 3:31:53 PM
Creation date
12/18/2017 3:31:52 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPFLO-2017-00015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A <br /> December 15,2017 Montgomery Associates i' <br /> Page 2 of 2 Resource Solutions <br /> In summary,the installation of underground electric line will not obstruct flow or result in an increase in <br /> the regional flood(greater than or equal to a hundredth of a foot)nor will it reduce the capacity of the <br /> floodplain to store flood waters.The electric line will be enclosed in conduit and thereby floodproofed. <br /> Thus,the project will be in conformance with the County Floodplain Zoning Ordinance. <br /> Please contact me at 608-839-4422 should you have any questions. <br /> Sincerely, <br /> Montgomery Associates:Resource Solutions,LLC <br /> ./4 <br /> Dane Wudel,EIT <br /> Ryan Stenjem,P.E. <br /> Enclosures: Figure 1 <br /> Dane County Floodplain Development Permit Application <br /> Permit Fee($125.00) <br /> Cc: Dana Halverson,Alliant Energy <br /> P:\1530-Pliant Energy Services 2012\1530-244 Old CTH PB Bridge Reciacement\Carespandenee\Dane Canty Floodplain Zoning Letter.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.