|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2018-00233
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2018
>
DCPZP-2018-00233
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2019 9:21:17 AM
Creation date
7/3/2018 1:26:24 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2018-00233
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Intertek rta <br /> voop/ Ripon Office <br /> 608 North Stanton St <br /> Ripon, Wisconsin 54971 <br /> August 4, 2017 <br /> Mr. Dave Utek <br /> Keller Construction <br /> N216 State Highway 55 <br /> Kaukauna, WI 54130 <br /> SUBJECT: Subsurface Exploration and Foundation Evaluation <br /> Proposed Golden Oil Refueling Station <br /> Stoughton, Wisconsin <br /> PSI Project No.0092822 <br /> Dear Mr. Utek, <br /> The subsurface exploration and foundation evaluation for the referenced project has been <br /> completed. An electronic copy of the report is included herein. Hard copies will be provided <br /> upon request. <br /> After you have had the opportunity of reading the report, please call at any time with any <br /> questions or comments you may have. Professional Service Industries, Inc. (PSI) appreciates <br /> the opportunity to be of service on this project, and looks forward to continuing as your <br /> geotechnical consultant during the design and construction phases. <br /> Respectfully submitted, <br /> PROFESSIONAL SERVICE INDUSTRIES, INC. <br /> Jeffery L. Fischer <br /> Branch Manager <br /> 6 Irt m•1414 <br /> James M. Becco, P.E. <br /> Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.