Laserfiche WebLink
Subsurface Exploration and Foundation Evaluation <br /> Proposed Golden Oil Refueling Station <br /> Stoughton, Wisconsin <br /> PSI Project No. 0092822 <br /> Page 14 <br /> *Defined in NR 151.002(14r) as a "soil that has at least a 3-foot deep layer with at least 20 <br /> percent fines; or at least a 5-foot deep layer with at least 10 percent fines; or an engineered <br /> soil with an equivalent level of protection as determined by the regulatory authority for the <br /> site." <br /> The information presented above is provided as general guidance for considering stormwater <br /> management in conjunction with the encountered subsurface conditions. However, Chapter <br /> NR151 of the Wisconsin Administrative Code, the Site Evaluation for Stormwater Infiltration <br /> (1002) document, or other applicable references must be consulted for appropriate site <br /> specific stormwater design guidance and requirements. <br /> PAVEMENT DESIGN RECOMMENDATIONS <br /> Pavements for this project are understood to consist of asphalt parking and drive areas, which <br /> will primarily be subjected to high volumes of passenger and semi-truck traffic. Specific traffic <br /> loading design details were not known at the time of this report. However, for the purpose of <br /> this analysis, an estimated average daily traffic loading of 145-18-kip ESALs/day was <br /> estimated. When traffic loading details are finalized, they must be discussed with PSI to <br /> determine if a re-evaluation of the recommendations contained herein is warranted. <br /> The pavement subgrade soils encountered at borings B-5 through B-7 consisted of silty sand <br /> and silty clay. The silty clay soils, with the poorer support characteristics, have been assigned <br /> an estimated visual AASHTO classification of A-6. The silty clay soils are generally rated as <br /> poor for pavement subgrade support based on their high shrink-swell potential, moderate to <br /> high frost susceptibility, poor drainage characteristics, and their high potential to soften when <br /> exposed to moisture. A frost index of F-3, a design group index of 14, a soil support value <br /> (SSV) of 4.0, and a subgrade modulus of 150 pci was used for this analysis. In order to use <br /> this value, all new fill used to raise low areas must have pavement support characteristics that <br /> are equal to or better than the existing soils. <br /> During construction, the surficial subgrade soils can become wet, softened and disturbed from <br /> rainfall and construction equipment. Therefore, prior to placing the pavement base materials, <br /> the subgrade must be recompacted and proofrolled. Particular attention should be given to <br /> high traffic areas that have become rutted and areas of backfilled trenches. Localized wet, <br /> soft, or unstable areas can be undercut to such depths determined necessary in the field to <br /> reach stable materials, and the area backfilled with crushed stone, such as 1% or 1% inch <br /> traffic bond (Section 305 of the State of Wisconsin Standard Specification for Highway and <br /> Structure Construction). If relatively large or thick zones of extensive yielding are observed, <br /> and normal discing and recompaction procedures cannot stabilize them, undercutting and <br /> replacement with crushed stone and geotextile fabric (if needed) may also be required in these <br /> areas. Preparation of the pavement subgrade must be performed as outlined in the Site <br /> Preparation section of this report. <br /> In view of the estimated traffic loading, and subgrade soils for this project, analysis of the <br /> proposed pavement and recommended pavement section were based upon a 20-year design <br /> life, regional factor of 3.0 and terminal serviceability of 2.0. The following table presents the <br /> recommended thickness for a flexible pavement structure on a properly prepared silty clay <br /> subgrade, along with their recommended structural coefficients. As previously noted, <br />